N.H. Code Admin. R. Env-Wq 1019.04

Current through Register No. 25, June 20, 2024
Section Env-Wq 1019.04 - Application Requirements

The following shall appear on or with all plans and specifications for pressure distribution systems submitted for review:

(a) All calculations as indicated on a pressure distribution worksheet, revised 4/96, found at http://des.nh.gov/organization/commissioner/pip/forms/ssb/documents/ssb_pd_worksheet.doc;
(b) All details for network layout;
(c) Pump/pump station or siphon details;
(d) Network drainage to avoid freezing potential;
(e) All construction methods for basal area preparation; and
(f) Inspection/construction requirements as follows:
(1) "Basal area preparation to be inspected by system designer prior to fill placement. An inspection report shall be submitted to the regional inspector at the time of final inspection.";
(2) "Caution to be exercised during fill placement/site preparation to avoid compaction or smearing of infiltrative surface."; and
(3) "Maintain 8-12 inches of fill between equipment tracks and prepared surface."

N.H. Code Admin. R. Env-Wq 1019.04

(See Revision Note at chapter heading for Env-Wq 1000) #9086, eff 2-9-08

Amended by Volume XXXVI Number 41, Filed October 13, 2016, Proposed by #11184, Effective 10/1/2016, Expires 10/1/2026.