Current through Register No. 45, November 7, 2024
Section Env-Sw 314.12 - Financial Report The applicant shall provide a financial report, including:
(a) The estimated cost of constructing the facility, unless the facility is an existing facility and no new construction is proposed;(b) The type and source of financing for any new construction being proposed;(c) The estimated facility operating cost(s), unless the facility is no longer operating and is not proposing to recommence operations;(d) For a proposed facility or an existing facility that will continue operating, the estimated tipping fees or, if no tipping fee will be assessed by the facility, the estimated average cost per ton to manage waste at the facility;(e) The estimated costs of closure, including post-closure monitoring, based on the requirements set forth in Env-Sw 1400; and(f) A financial assurance plan in accordance with Env-Sw 1400.N.H. Admin. Code § Env-Sw 314.12
(see Revision Note at chapter heading for Env-Sw 300) #8462-B, eff 10-28-05
Amended byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10595, Effective 7/1/2014, Expires7/1/2024.