Section Env-Sw 2106.04 - Project-Specific Work Plans; Content

A project-specific work plan shall include:

(a) Name, mailing address, email address, daytime telephone number including area code, and credentials of the qualified individual who prepared the plan;
(b) Project location and name, mailing address, email address, and daytime telephone number including area code of each owner;
(c) Name, mailing address, email address, and daytime telephone number including area code of the entity or individual responsible for initiating and undertaking the project, if not the owner(s);
(d) Project schedule, including the anticipated starting date and completion date;
(e) For work plans that include license-required work, the name, mailing address, email address, daytime telephone number including area code, and ADS contractor identification information of the qualified ADS contractor, if known at the time the work plan is submitted;
(f) If the work plan includes license-exempt work only and will not be done by a licensed ADS contractor, a statement to that effect;
(g) If known, the name, mailing address, email address, telephone number including area code, and ADS worker identification information of the qualified individual who will be in charge of the work;
(h) A description of the work to be undertaken, including:
(1) The reason for undertaking the work;
(2) Quantity of asbestos to be disturbed;
(3) Type and general description of asbestos to be disturbed;
(4) Sequence of tasks, starting with site preparation pursuant to Env-Sw 2105.08 and ending with the site clearance determination required by Env-Sw 2105.15;
(5) A description of the procedures and equipment to be used to control emissions during the excavation, storage, transport, and ultimate disposal of the asbestos waste, including the methods and procedures by which the work practices and engineering controls in Env-Sw 2105 will be met; and
(6) The location of any temporary storage site and the final disposal site for asbestos excavated or otherwise removed from the site;
(i) A scaled plan of the site showing the existing site features and the proposed work area;
(j) A scaled plan and related specifications showing the proposed conditions of the site following completion of the work, including information that demonstrates the proposed post-project conditions comply with the cover requirements in Env-Sw 2104.03;
(k) Provisions for providing project commencement notice pursuant to Env-Sw 2105.07;
(l) A list and status of all other local, state, or federal permits and other approvals required to implement the plan;
(m) A statement, signed by the qualified individual who prepared the plan, certifying that the plan meets all applicable local, state, and federal requirements for management of asbestos, including but not limited to the requirements listed in Env-Sw 2101.01(b), as applicable, and this chapter; and
(n) A signed statement by the applicant, certifying acceptance of the proposed work plan.

N.H. Admin. Code § Env-Sw 2106.04

#7647, eff 2-16-02 (See Revision Note at chapter heading for Env-Sw 2100) (formerly Env-Wm 3906.04); ss by #9645, eff 2-16-10

Amended by Volume XXXVIII Number 37, Filed September 13, 2018, Proposed by #12605, Effective 9/1/2018, Expires 9/1/2028.