Section Env-Dw 305.05 - Process for Obtaining Approval
(a) A person seeking approval pursuant to Env-Dw 305.04(a) shall submit a preliminary report to the department that contains the following:
(1) The cover page specified in Env-Dw 305.06, which has been signed as specified in Env-Dw 305.07; and
(2) The information and maps specified in Env-Dw 305.08.
(b) All work conducted to fulfill the requirements of Env-Dw 305 shall be completed by, or under the supervision of, an individual who is:
(1) Qualified by training and experience to complete the work required by Env-Dw 305; and
(2) At least one of the following, as applicable based on the specific work being performed:
a. A professional geologist (P.G.) licensed to work in New Hampshire pursuant to RSA 310-A;
b. A professional engineer (P.E.) licensed to work in New Hampshire pursuant to RSA 310-A;
c. A water system operator licensed in New Hampshire pursuant to RSA 332-E;
d. A water well contractor licensed in New Hampshire pursuant to RSA 482-B; or
e. A pump installer licensed in New Hampshire pursuant to RSA 482-B.
(c) The preliminary report submitted pursuant to (a), above, shall be:
(1) Signed and dated by the individual who completed or supervised the work as required by (b), above, and if the individual is a P.G. or P.E., stamped or sealed by the individual; and
(2) Filed electronically in a portable document format.
(c) The department shall review the preliminary report as specified in Env-Dw 305.16.
(d) If the department approves the preliminary report and the applicant wishes to continue, the applicant shall proceed as specified in Env-Dw 305.18.

N.H. Admin. Code § Env-Dw 305.05

Adopted by, Volume XXXVI Number 14, Filed April 7, 2016, Proposed by #11062, Effective 4/1/2016, Expires 4/1/2026.