The Mechanical Compliance Section shall cancel an operating permit for a boiler or pressure vessel if it is moved from the site at which the boiler or pressure vessel was inspected. If the boiler or pressure vessel is reinstalled, it must be inspected, and a new permit will be issued by the Mechanical Compliance Section.
Nev. Admin. Code § 455C.142