Section 455C.140 - Requirement; duration; location; operation before issuance1. The owner of a boiler or pressure vessel must obtain an operating permit before the boiler or pressure vessel may be operated in this State unless the boiler or pressure vessel is exempted from that requirement pursuant to NAC 455C.114.2. An operating permit is valid until the earliest date of the following:(a) Its date of expiration;(b) The date the boiler or pressure vessel for which the permit is issued is removed from the location in which it was installed;(c) A defect or condition affecting the safety of the boiler or pressure vessel is discovered;(d) It is revoked by the Mechanical Compliance Section for nonpayment of fees; or(e) It is revoked by the Mechanical Compliance Section for any other reason.3. The operating permit must be retained on the premises where the boiler or pressure vessel is installed.Nev. Admin. Code § 455C.140