Current through November 8, 2024
Section 444.422 - Changes in plans; review of plans; structural adequacy1. Public spa facilities must be built in accordance with the plans as approved, unless prior approval of any changes is obtained in writing from the health authority.2. The review of the plans by the health authority will not include review of structural design or structural stability of any part of a public spa. Certification of structural adequacy is the responsibility of the design engineer, architect, licensed contractor or the manufacturer.3. The health authority shall review the plans within 30 days after receiving them.Nev. Admin. Code § 444.422
Bd. of Health, Public Spa Reg. Art. 2 §§ 2.2-2.3, eff. 11-27-79NRS 439.200, 444.070, 444.080