229 Neb. Admin. Code, ch. 3, § 004

Current through September 17, 2024
Section 229-3-004

All new installations of boilers, water heaters or pressure vessels shall be inspected by the state chief boiler inspector or a deputy state boiler inspector prior to operation of the unit.

229 Neb. Admin. Code, ch. 3, § 004

Amended effective 8/7/2016.