At least ten days prior to the installation, construction, or operation of any new, used, or reinstalled jurisdictional boiler or pressure vessel, the contractor, person, or entity responsible for installing or constructing the boiler or pressure vessel shall give notice of the proposed installation to the Commissioner using the electronic/online form provided on the Department's website. The notice shall designate the proposed place and date of installation, the type and capacity of the boiler or pressure vessel, the use to be made of the boiler or pressure vessel, the name of the company which manufactured the boiler or pressure vessel, and whether the boiler or pressure vessel is new or used or being reinstalled. Any inspection of a new installation for which notice was not given to the Commissioner in accordance with this chapter and Neb. Rev. Stat. § 48-730 shall be deemed a special inspection under 229 NAC 7 §005(A)(2); except that if the installation was done as a part of a repair process and written notice was given to the Commissioner prior to actual installation, the inspection shall not be considered a special inspection under 229 NAC 7 §005(A)(2).
229 Neb. Admin. Code, ch. 3, § 003