6 Miss. Code. R. 3-4.3

Current through October 31, 2024
Rule 6-3-4.3 - Contracts within MDA's Purview

Contracts authorized in Section 31-7-14(4) (b) differ from "energy services contracts" authorized in Section 31-7-14(1) (b) that do not require MDA-ENRD involvement and do not require energy or cost savings to be guaranteed. Projects where there are minimal scientifically quantifiable and measurable energy savings, i.e., MDA-ENRD's expertise is not required, may be pursued under this Section 31-7-14(1) (b) as "Energy Services Contract."

6 Miss. Code. R. 3-4.3

Adopted 6/5/2016