6 Miss. Code. R. 3-4.2

Current through October 31, 2024
Rule 6-3-4.2 - Responsibility

MDA-Energy and Natural Resources Division (MDA-ENRD)'s role in evaluating "energy saving performance contracts" and "shared savings contracts" under Section 31-7-14(4) (b) is to ensure that entities can rely upon projected and guaranteed energy savings and related cost savings. Consequently, these policies and procedures for "energy saving performance contracts" and "shared savings contracts" are developed in order for MDA-ENRD to make determinations that contracts conform to the law.

6 Miss. Code. R. 3-4.2

Miss. Code Ann. § 31-7-14 (Supp. 2015).
Adopted 6/5/2016