Regardless of the basis of waiver, the primary documentation of acceptance (i.e. certificate from the Project Engineer or certification from the Producer) shall be provided by the Project Engineer with copies to the District Materials Engineer, State Materials Engineer, and State Construction Engineer. This documentation shall include the material and quantity covered by the acceptance.
37 Miss. Code. R. § 1-7201-02300-104