When the installation or alteration is completed, the person making the installation or alteration must notify the Board prior to placing into operation. A Board inspector shall inspect the installation within a reasonable time so as not to cause undue delay in the progress of the construction contract or installation. The inspector shall determine whether the installation complies with all applicable statutes and rules. If the inspector determines that the installation does not comply, the facility must not be placed into operation and the procedures set forth in 32 M.R.S. § 18110 apply.
02-658 C.M.R. ch. 12, § 3