Current through 2025-03, January 15, 2025
Section 385-840-5 - Conditional Operation of an Existing Non-Compliant Private Water System1.Order of Conditional Operation.The Board, upon request or upon its own initiative, may provide additional time for a Licensee to bring an existing Non-Compliant Private Water System into compliance when correcting a violation, deficiency, or water quality issue. The additional time may be granted by an Order of Conditional Operation, provided the following criteria are met: A. A detailed plan for water system quality compliance, including remedial measures to be taken, a specific schedule for completion, and identification of a Designated Operator, is approved by the Board;B. The health and safety of the water consumers are not jeopardized;C. All consumers are provided with potable water at all times, at the expense of the Licensee;D. When required, adequate notification concerning the water quality of the water system is provided to the consumers during the additional time period; and E. Any other measures deemed appropriate and necessary by the Board and by the Division. 02-385 C.M.R. ch. 840, § 5