Current through 2024-46, November 13, 2024
Section 001-358-7 - Plant ConstructionA. New plants constructed should have operations in natural sequence to eliminate potential contamination factors.1. Sorting-grading rooms, where used.3. Cooling-storage area, adequately vented, and opening directly into refrigerated rooms used to store cooked crabs.4. Picking room. Exits shall be provided from this room so as to eliminate unessential traffic through other parts of the plant.5. Equipment washing-storage room. If an extra room is provided for washing and storing of utensils, a direct entrance shall be provided into the picking room.6. Weighing and packing room shall be so situated and arranged as to give the packing room personnel a full view of the picking room.7. All units shall be directly connected and under one roof so as to eliminate contamination potentials.8. Floors shall have at least 1/14 inch grade per foot.9. Walls shall be of smooth, nonporous, easily cleanable construction.10. Floor/wall joints should be covered.11. One handwash sink shall be provided for each ten pickers. A container for sanitizer shall be provided near the handwash facilities.12. A two-compartment sink with hot and cold running water. This unit shall be used for scrubbing utensils and rinsing in a bactericidal solution.B.ViolationsAny person who violates any provision of this rule may be punished in any manner authorized under Chapter 551 of Title 22 MRSA §§2151 - 2171).
01-001 C.M.R. ch. 358, § 7