Section XIII-1163 - Instrument, Control, and Sampling Pipe and Components [49 CFR 192.203]
A. Applicability. This Section applies to the design of instrument, control, and sampling pipe and components. It does not apply to permanently closed systems, such as fluid-filled temperature-responsive devices. [ 49 CFR 192.203(a)]
B. Materials and Design. All materials employed for pipe and components must be designed to meet the particular conditions of service and the following. [ 49 CFR 192.203(b)]
1. Each takeoff connection and attaching boss, fitting, or adapter must be made of suitable material, be able to withstand the maximum service pressure and temperature of the pipe or equipment to which it is attached, and be designed to satisfactorily withstand all stresses without failure by fatigue. [ 49 CFR 192.203(b)(1)]
2. Except for takeoff lines that can be isolated from sources of pressure by other valving, a shutoff valve must be installed in each takeoff line as near as practicable to the point of takeoff. Blowdown valves must be installed where necessary. [ 49 CFR 192.203(b)(2)]
3. Brass or copper material may not be used for metal temperatures greater than 400°F (204°C). [ 49 CFR 192.203(b)(3)]
4. Pipe or components that may contain liquids must be protected by heating or other means from damage due to freezing. [ 49 CFR 192.203(b)(4)]
5. Pipe or components in which liquids may accumulate must have drains or drips. [ 49 CFR 192.203(b)(5)]
6. Pipe or components subject to clogging from solids or deposits must have suitable connections for cleaning. [ 49 CFR 192.203(b)(6)]
7. The arrangement of pipe, components, and supports must provide safety under anticipated operating stresses. [ 49 CFR 192.203(b)(7)]
8. Each joint between sections of pipe, and between pipe and valves or fittings, must be made in a manner suitable for the anticipated pressure and temperature condition. Slip type expansion joints may not be used. Expansion must be allowed for by providing flexibility within the system itself. [ 49 CFR 192.203(b)(8)]
9. Each control line must be protected from anticipated causes of damage and must be designed and installed to prevent damage to any one control line from making both the regulator and the over-pressure protective device inoperative. [ 49 CFR 192.203(b)(9)]

La. Admin. Code tit. 43, § XIII-1163

Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:228 (April 1983), amended LR 10:520 (July 1984), LR 20:445 (April 1994), LR 24:1309 (July 1998), LR 27:1541 (September 2001), LR 30:1240 (June 2004).