Whenever an oil well producing in a prorated area fails to produce its allowable, this shortage or underage shall be carried forward for two months upon the monthly proration report of the commission. The well shall be permitted to produce the underage in addition to its designated allowable. If the commission determines, however, that a proration unit is incapable of producing its allowable, the accrued underages shall be cancelled. Whenever shortages are attributable to the lack of transportation facilities, these shortages shall not be accrued for more than 60 days from the date of the initial productivity test, except as otherwise ordered by the commission.
Kan. Admin. Regs. § 82-3-201