Browse as ListSearch Within- Section 82-3-100 - Applicability; exception
- Section 82-3-101 - Definitions
- Section 82-3-101a - Procedures for determining location using global positioning system
- Section 82-3-102 - Classification of wells; determining and naming common sources of supply; nomenclature committee
- Section 82-3-103 - Notice of intention to drill; penalty
- Section 82-3-103a - Deviated holes; horizontal drilling; notice and hearing required
- Section 82-3-104 - Pollution; prevention
- Section 82-3-105 - Well cementing
- Section 82-3-106 - Surface casing and cement
- Section 82-3-107 - Preservation of well samples, cores, and logs; penalty
- Section 82-3-108 - Well location; exception
- Section 82-3-109 - Well spacing orders and basic proration orders
- Section 82-3-110 - Penalties for violations of well spacing, basic proration orders
- Section 82-3-111 - Temporarily abandoned wells; penalty; plugging
- Section 82-3-112 - Shut-off test; when required
- Section 82-3-113 - Notice of intention to plug and abandon a well; supervision; penalty
- Section 82-3-114 - Plugging methods and procedure
- Section 82-3-115 - Plugging methods and procedure for core and other stratigraphic holes; fees
- Section 82-3-115a - Intent to drill seismic shot holes; notification; penalty; exemption
- Section 82-3-115b - Plugging methods and procedures for seismic shot holes; retention of logs; penalty; exception; fees
- Section 82-3-116 - Core and other stratigraphic holes to be plugged; affidavit
- Section 82-3-117 - Plugging report; penalty
- Section 82-3-118 - Costs
- Section 82-3-119 - Revoked
- Section 82-3-120 - Operator or contractor licenses: application; financial responsibility; denial of application; penalty
- Section 82-3-120a - Revoked
- Section 82-3-121 - Designation of an agent
- Section 82-3-122 - Operators; complaints; hearing
- Section 82-3-123 - Well bore; commingling of production
- Section 82-3-123a - Well bore; commingling of fluids
- Section 82-3-124 - Dual or multiple-completed wells
- Section 82-3-125 - Surface commingling of production
- Section 82-3-126 - Tank and truck identification; penalty
- Section 82-3-127 - Documentation required for transportation and storage
- Section 82-3-128 - Reports and permits; penalty
- Section 82-3-129 - Revoked
- Section 82-3-130 - Completion reports; penalty
- Section 82-3-131 - Vacuum and high volume pumps; application and approval
- Section 82-3-132 - Re-entry notification
- Section 82-3-133 - Penalties for unlawful production
- Section 82-3-133a - Balancing overages and underages in nonprorated areas; penalty
- Section 82-3-134 - Revoked
- Section 82-3-135 - Notice of hearings
- Section 82-3-135a - Notice of application
- Section 82-3-135b - Protesters
- Section 82-3-136 - Transfer of operator responsibility
- Section 82-3-137 - Change in purchasers
- Section 82-3-138 - New pool application
- Section 82-3-139 - Revoked
- Section 82-3-140 - Tertiary recovery project certification
- Section 82-3-141 - Revoked
- Section 82-3-142 - Revoked
- Section 82-3-143 - Revoked
- Section 82-3-144 through 82-3-199 - Reserved
- Section 82-3-200 - Prevention of waste, protection of correlative rights, and prevention of discrimination between pools
- Section 82-3-201 - Oil production in prorated areas: balancing of underages
- Section 82-3-202 - Productivities, methods of determining, when required
- Section 82-3-203 - Production allowable
- Section 82-3-204 - Reports by producers
- Section 82-3-205 - Revoked
- Section 82-3-206 - Oil conservation assessment
- Section 82-3-207 - Oil drilling unit
- Section 82-3-208 - Venting or flaring of casinghead gas
- Section 82-3-209 - Flaring of sour gas
- Section 82-3-210 through 82-3-299 - Reserved
- Section 82-3-300 - Assignment of gas allowables in prorated pools; notice
- Section 82-3-300a - Reinstatement of cancelled underage
- Section 82-3-301 - Revoked
- Section 82-3-302 - Revoked
- Section 82-3-303 - Determination of open flow of a gas well
- Section 82-3-304 - Tests of gas wells
- Section 82-3-305 - Gas to be metered
- Section 82-3-306 - Report of gas produced
- Section 82-3-307 - Gas conservation assessment
- Section 82-3-308 - Revoked
- Section 82-3-309 - Revoked
- Section 82-3-310 - Natural gas pipeline maps
- Section 82-3-311 - Drilling through gas storage formations
- Section 82-3-311a - Drilling through CO2 storage facility or CO2 enhanced oil recovery reservoirs
- Section 82-3-312 - Gas allowables and drilling unit
- Section 82-3-313 - Revoked
- Section 82-3-314 - Venting or flaring of gas other than casinghead gas
- Section 82-3-315 through 82-3-399 - Reserved
- Section 82-3-400 - Injection allowed only by permit; penalty
- Section 82-3-401 - Application for injection well; content
- Section 82-3-401a - Revoked
- Section 82-3-401b - Revoked
- Section 82-3-402 - Notice of application; objection
- Section 82-3-403 - Permitting factors; application approval
- Section 82-3-404 - Notice of commencement and discontinuance of injection operations; cessation of production from dually completed well; penalty
- Section 82-3-405 - Casing and cement
- Section 82-3-406 - Injection well tubing and packer requirements
- Section 82-3-407 - Mechanical integrity requirements; penalty
- Section 82-3-408 - Duration of injection well permits; modification penalty
- Section 82-3-409 - Record retention; annual report; penalty
- Section 82-3-410 - Transfer of authority to inject; penalty
- Section 82-3-411 - Authorization for existing injection wells
- Section 82-3-412 - Assessment of costs
- Section 82-3-413 through 82-3-499 - Reserved
- Section 82-3-500 - Revoked
- Section 82-3-501 - Revoked
- Section 82-3-502 - Revoked
- Section 82-3-503 - Revoked
- Section 82-3-504 - Revoked
- Section 82-3-505 through 82-3-599 - Reserved
- Section 82-3-600 - Pit permits; penalty; application and approval
- Section 82-3-600a - Pit permit revocation
- Section 82-3-600b - Revoked
- Section 82-3-601 - Revoked
- Section 82-3-601a - Pit construction; sensitive groundwater areas; reporting
- Section 82-3-601b - Sensitive groundwater areas; exception procedure
- Section 82-3-602 - Closure of pits; disposal of pit contents; closure form; drilling fluid management; surface restoration
- Section 82-3-603 - Spill notification and cleanup; penalty; lease maintenance
- Section 82-3-603a - Spill notification to landowner or representative; penalty
- Section 82-3-604 - Discharges into emergency pits and diked areas; removal of fluids; penalties
- Section 82-3-605 - Revoked
- Section 82-3-606 - Chemical dumping prohibited; penalty
- Section 82-3-607 - Disposal of dike and pit contents
- Section 82-3-608 - Transfer of refuse
- Section 82-3-700 - Definitions
- Section 82-3-701 - Intent to drill cathodic protection boreholes; notification; penalty; exemption
- Section 82-3-702 - Construction of cathodic protection boreholes, measurements, logging, reports, penalty
- Section 82-3-703 - Surface construction requirements, appurtenances, vault and below-ground construction, penalty
- Section 82-3-704 - Plugging methods and procedures for cathodic protection boreholes, site restoration, submission of plugging report, penalty
- Section 82-3-705 - Groundwater management districts #2 and #5: permit to drill cased and uncased cathodic protection boreholes; notification; exceptions; drilling pit application
- Section 82-3-706 - Groundwater management districts #2 and #5: drilling contractor; logging; construction; reports
- Section 82-3-707 - Groundwater management districts #2 and #5: anode, anode conductor, and anode conductor grout requirements for cased and uncased boreholes
- Section 82-3-708 - Groundwater management districts #2 and #5: surface construction requirements for cased cathodic protection boreholes
- Section 82-3-709 - Groundwater management districts #2 and #5: construction specifications for uncased cathodic boreholes
- Section 82-3-710 - Groundwater management districts #2 and #5: abandonment, plugging methods, and procedures for cathodic protection boreholes, reports, and restoration
- Section 82-3-800 - Licensing
- Section 82-3-801 - Report furnished by persons offering gas-gathering services; penalty
- Section 82-3-802 - Gas-gathering services and access, complaint, hearing
- Section 82-3-803 - Abuse of complaint procedure
- Section 82-3-804 - Notice of termination
- Section 82-3-900 - Enhanced recovery severance tax exemption, application, hearing, penalty
- Section 82-3-901 - Determination of base production
- Section 82-3-902 - Relief from severance tax; when available
- Section 82-3-903 - Certification of well history; right to review
- Section 82-3-904 - Wells qualifying for both new pool and production enhancement severance tax exemptions
- Section 82-3-905 - New technology; qualification for severance tax exemption
- Section 82-3-906 - Production enhancement projects; secondary recovery projects
- Section 82-3-907 - Production enhancement project; multiple well lease
- Section 82-3-908 - Definition, start-up date
- Section 82-3-1000 - Definitions: underground porosity gas storage facilities
- Section 82-3-1001 - Notice of federal energy regulatory commission proceedings
- Section 82-3-1002 - Provisional operating permits and operating requirements for existing underground porosity storage facilities; penalties
- Section 82-3-1003 - Fully authorized operating permits and operating requirements for existing and new underground porosity gas storage facilities and underground porosity gas storage wells; penalties
- Section 82-3-1004 - Notice of application for a permit to operate an underground porosity gas storage facility constructed after July 1, 2002
- Section 82-3-1005 - Testing and inspection requirements for underground porosity gas storage facilities and underground porosity gas storage wells; penalty
- Section 82-3-1006 - Storage facility monitoring and reporting
- Section 82-3-1007 - Identification signs
- Section 82-3-1008 - Safety inspections
- Section 82-3-1009 - Transfer of a gas storage permit; penalty
- Section 82-3-1010 - Notice of plugging, plugging methods and procedures, plugging report, and plugging fee for gas storage wells; penalty
- Section 82-3-1011 - Temporary abandonment of storage wells; well plugging; temporary and permanent abandonment of a storage facility; penalties
- Section 82-3-1012 - Assessment of costs for underground porosity gas storage facilities and gas storage wells
- Section 82-3-1100 - [Revoked]
- Section 82-3-1101 - [Revoked]
- Section 82-3-1102 - [Revoked]
- Section 82-3-1103 - [Revoked]
- Section 82-3-1104 - [Revoked]
- Section 82-3-1105 - [Revoked]
- Section 82-3-1106 - [Revoked]
- Section 82-3-1107 - [Revoked]
- Section 82-3-1108 - [Revoked]
- Section 82-3-1109 - [Revoked]
- Section 82-3-1110 - [Revoked]
- Section 82-3-1111 - [Revoked]
- Section 82-3-1112 - [Revoked]
- Section 82-3-1113 - [Revoked]
- Section 82-3-1114 - [Revoked]
- Section 82-3-1115 - [Revoked]
- Section 82-3-1116 - [Revoked]
- Section 82-3-1117 - [Revoked]
- Section 82-3-1118 - [Revoked]
- Section 82-3-1119 - [Revoked]
- Section 82-3-1120 - [Revoked]
- Section 82-3-1200 - Definitions; compressed air energy storage
- Section 82-3-1201 - Licensing; financial assurance
- Section 82-3-1202 - Signatory; signature for reports
- Section 82-3-1203 - Permit required; permit application
- Section 82-3-1204 - Notice of application; publication; protest
- Section 82-3-1205 - Permit amendment
- Section 82-3-1206 - Permit transfer
- Section 82-3-1207 - Permit modification, suspension, and cancellation
- Section 82-3-1208 - Site selection
- Section 82-3-1209 - Design and construction of storage well
- Section 82-3-1210 - Storage facility construction and integrity
- Section 82-3-1211 - Storage well workover
- Section 82-3-1212 - Operation, monitoring, and measurement requirements for cavern storage wells
- Section 82-3-1213 - Operation, monitoring, and measurement requirements for reservoir storage wells
- Section 82-3-1214 - Long-term monitoring, measurement, and testing for cavern storage facilities and cavern storage wells
- Section 82-3-1215 - Long-term monitoring, measurement, and testing for reservoir storage facilities and reservoir storage wells
- Section 82-3-1216 - Safety and emergency response plan
- Section 82-3-1217 - Safety inspection
- Section 82-3-1218 - Plugging-monitoring status
- Section 82-3-1219 - Storage well plugging
- Section 82-3-1220 - Temporary abandonment of reservoir storage wells and reservoir storage facilities
- Section 82-3-1221 - Decommissioning and abandonment of a storage facility
- Section 82-3-1222 - Reporting required; record retention
- Section 82-3-1223 - Fees
- Section 82-3-1300 - Definitions; horizontal wells
- Section 82-3-1301 - Horizontal wells
- Section 82-3-1302 - Notice of intention to drill; setback
- Section 82-3-1303 - Oil and gas allowables
- Section 82-3-1304 - Gas well test exemption
- Section 82-3-1305 - Venting and flaring
- Section 82-3-1306 - High-volume pumps
- Section 82-3-1307 - Well completion report
- Section 82-3-1400 - Hydraulic fracturing treatment; definitions
- Section 82-3-1401 - Hydraulic fracturing treatment; chemical disclosure
- Section 82-3-1402 - Hydraulic fracturing treatment; disclosure of trade secrets