Each operator of a horizontal well shall comply with the affidavit requirements in K.A.R. 82-3-106 and K.A.R. 82-3-130 by submitting to the conservation division and obtaining approval of a well completion report on a form provided by the commission, which shall include the true vertical depth and information specific to the horizontal well. Each submitted form shall be accompanied by a copy of the directional survey and a detailed, as-drilled plat map that includes the lease or unit boundaries, surface location, completion interval, and bottom-hole location.
Kan. Admin. Regs. § 82-3-1307