Kan. Admin. Regs. § 28-16-129

Current through Register Vol. 43, No. 24, June 13, 2024
Section 28-16-129 - Value engineering

Each loan recipient for a sewerage project shall conduct value engineering during the design phase of the project if the total estimated project cost exceeds $10 million. The value engineering recommendations shall be implemented to the maximum extent possible as approved by the secretary.

Kan. Admin. Regs. § 28-16-129

Authorized by K.S.A. 1988 Supp. 65-3323; implementing K.S.A. 1988 Supp. 65-3322; effective May 29, 1989.