675 Ind. Admin. Code 14-4.4-181

Current through May 29, 2024
Section 675 IAC 14-4.4-181 - Section P3011; replacement of underground sewers by PVC fold and form methods

Authority: IC 22-13-2-2; IC 22-13-2-2.5; IC 22-13-2-13

Affected: IC 22-12; IC 22-13; IC 22-14; IC 22-15; IC 36-7

Sec. 181.

Delete SECTION P3011 in its entirety without substitution.

675 IAC 14-4.4-181

Fire Prevention and Building Safety Commission; 675 IAC 14-4.4-181; filed 11/26/2019, 11:43 a.m.: 20191225-IR-675190330FRA