Current through October 31, 2024
Section 329 IAC 4.1-11-2 - Contingency planAuthority: IC 13-20-15-1
Affected: IC 13-20-15-6
Sec. 2.
(a) The owner or operator of:(1) an incinerator or high efficiency boiler;(2) a chemical waste landfill;(3) an alternative disposal facility; or(4) a mobile facility; shall prepare and maintain a contingency plan in accordance with 40 CFR 264.51 through 40 CFR 264.54.
(b) The contingency plan must be as follows: (1) Designed to minimize hazards to human health and the environment from any of the following: (C) Any unplanned sudden or nonsudden release of PCB waste to any of the following:(2) Meet the requirements of 40 CFR 264.51 through 40 CFR 264.54.(c) A person required to prepare a contingency plan shall provide copies of the contingency plan to the: (1) local emergency planning committee; and(2) emergency management director; for the county in which the facility is located before operation of the facility begins.
Solid Waste Management Board; 329 IAC 4.1-11-2; filed Jul 14, 2000, 11:09 a.m.: 23 IR 3082; filed Nov 21, 2006, 7:21 a.m.: 20061220-IR-329050219FRA