329 Ind. Admin. Code 10-2-51

Current through May 29, 2024
Section 329 IAC 10-2-51 - "Current post-closure cost estimate" defined

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 25-31; IC 36-9-30

Sec. 51.

"Current post-closure cost estimate" means the original post-closure cost estimate or the most recent revision thereof made in accordance with 329 IAC 10-39.

329 IAC 10-2-51

Solid Waste Management Board; 329 IAC 10-2-51; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1770