329 Ind. Admin. Code 10-2-50

Current through October 31, 2024
Section 329 IAC 10-2-50 - "Current closure cost estimate" defined

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 25-31; IC 36-9-30

Sec. 50.

"Current closure cost estimate" means the original closure cost estimate or the most recent revision thereof made in accordance with 329 IAC 10-39.

329 IAC 10-2-50

Solid Waste Management Board; 329 IAC 10-2-50; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1770