329 Ind. Admin. Code 10-2-38

Current through October 31, 2024
Section 329 IAC 10-2-38 - "Construction quality assurance" or "CQA" defined

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 25-31; IC 36-9-30

Sec. 38.

"Construction quality assurance" or "CQA" means a planned system of activities that provides assurance that the solid waste land disposal facility was constructed as specified in the approved construction plan. Construction quality assurance includes inspections, verifications, audits, and evaluations of material and workmanship necessary to determine and document the quality of the constructed facility. Construction quality assurance refers to measures taken by a project engineer to assess if the installer or contractor is in compliance with the approved construction plan.

329 IAC 10-2-38

Solid Waste Management Board; 329 IAC 10-2-38; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1768; filed Aug 2, 1999, 11:50 a.m.: 22 IR 3765