Current through January 8, 2025
Section 327 IAC 8-3.4-5 - Required information regarding the mechanics of a new production wellAuthority: IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3-1; IC 13-18-4-1
Affected: IC 13-11-2; IC 13-13-5-1; IC 13-18-2
Sec. 5.
(a) The information required in this section shall be provided: (1) when a construction permit application is submitted; or(2) in accordance with section 6 of this rule as a postconstruction submittal.(b) The following information shall be provided for a production well, whether it is proposed for construction or modification:(1) The type of proposed well described as tubular, gravel pack, radial collector, rock, or other type of well.(2) The type of drilling method described as rotary, cable tool, bucket, or other type of drilling method.(3) The depth of the proposed well.(4) The following information regarding the casing of the proposed well: (B) Diameter of the casing.(C) Diameter of the borehole.(D) Casing material characteristics, including the following:(ii) Schedule or thickness.(iii) Pressure rating if polyvinyl chloride (PVC) is utilized as the casing material.(E) Relative elevation or mean sea level elevation of the following:(ii) Finished well house floor or slab.(iii) Top of gravel pack.(5) The following information regarding the well screen:(E) Design entrance velocity.(F) Elevation of the following: (6) The following information regarding the grout: (B) Depth and the extent of the grouting.(7) The following information regarding the well pump: (G) Provisions for power source.(H) Provisions for emergency operation.(8) A description of equipment utilized for water level measurement.(9) The following information regarding the discharge piping:(D) Description of the flow measuring equipment.(E) Location of the following:(iv) Smooth nosed sample tap.(v) Air relief or vacuum relief valves where applicable.(vi) Threaded or flanged port for maintenance and testing.(c) The plans required to be submitted with an application for construction permit under 327 IAC 8-3-3 must include a cross section and plan view of the applicable proposed production well mechanics that includes the following: (3) Well screen location.(5) Discharge piping or raw water transmission main and components.(6) Well house and other protective equipment.(9) Water treatment equipment.Water Pollution Control Board; 327 IAC 8-3.4-5; filed Jun 17, 1999, 1:50 p.m.: 22 IR 3369; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFAReadopted filed Jun 6, 2019, 1:59 p.m.: 20190710-IR-327190246BFA