Authority: IC 13-13-5; IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-2
Affected: IC 13-11-2; IC 13-15; IC 13-18
Sec. 25.
Each lift station shall be provided with an audible and visual alarm system that gives an alert for the following problems:
(5) Any pump station malfunction.Water Pollution Control Board; 327 IAC 3-6-25; filed May 17, 1999, 12:11 p.m.: 22 IR 3097; readopted filed Apr 11, 2005, 2:45 p.m.: 28 IR 2470; readopted filed Jun 15, 2011, 11:15 a.m.: 20110713-IR-327110193BFAReadopted filed Jun 29, 2017, 9:34 a.m.: 20170726-IR-327170225BFAReadopted filed 5/12/2023, 1:07 p.m.: 20230607-IR-327230079BFA