312 Ind. Admin. Code 25-1-155.5

Current through November 6, 2024
Section 312 IAC 25-1-155.5 - "Unanticipated event or condition" defined

Authority: IC 14-34-2-1

Affected: IC 14-34

Sec. 155.5.

"Unanticipated event or condition" means, for the purposes of 312 IAC 25-4-114, an event or condition that is encountered in a remining operation and was not contemplated by the applicable surface mining and reclamation permit.

312 IAC 25-1-155.5

Natural Resources Commission; 312 IAC 25-1-155.5; filed Apr 1, 2004, 3:00 p.m.: 27 IR 2445, eff Jan 1, 2005; readopted filed May 29, 2007, 9:51 a.m.: 20070613-IR-312070146RFA; readopted filed Sep 19, 2013, 10:12 a.m.: 20131016-IR-312130125RFA
Readopted filed 3/26/2019, 3:40 p.m.: 20190424-IR-312190011RFA