Current through Register Vol. 49, No. 1, January 3, 2025
Section 800.430 - Material Breacha) Recipient: Material breach under the contract will occur in the following instances:
1) any sale or disposition of the rail facility (track and materials) which is not approved in writing by the Department;2) failure to maintain the property at the level to which it was rehabilitated, improved or constructed, as provided in Section 800.330;3) failure to use the property for rail service, as provided in Section 800.330;4) filing of an application for abandonment under 49 U.S.C. 109(1985) or Ill. Rev. Stat. 1985, ch. 951/2, pars. 18C-1701 et seq. in the Interstate Commerce Commission or the Illinois Commerce Commission (92 Ill. Adm. Code 1520); and5) failure to comply with any portion of the contract involving the rights or obligations of the parties.b) Department: Material breach under the contract will occur when and if the Department fails to make any payment due to the recipient within a maximum of ninety days of receipt of a properly prepared invoice and any necessary documentation of work from the recipient.
Ill. Admin. Code tit. 92, § 800.430