Haw. Code R. § 19-1-13

Current through November, 2024
Section 19-1-13 - Continuances or extensions of time

Whenever a person or agency has a right or is required to take action within the period prescribed or allowed by this chapter, by notice given as prescribed by this chapter or by an order or rule, the presiding officer may (1) before the expiration of the prescribed period, with or without notice, extend such period; or (2) upon motion, permit the act to be done after the expiration of a specified period where the failure to act is reasonably shown to be excusable.

Haw. Code R. § 19-1-13

[Eff 6/1/81; comp OCT 16 2000] (Auth: HRS § 91-2) (Imp: HRS § 91-9)