Haw. Code R. § 11-270-25

Current through November, 2024
Section 11-270-25 - Specific Part B information requirements for equipment

Except as otherwise provided in section 11-264-1, owners and operators of facilities that have equipment to which subchapter BB of chapter 11-264 applies must provide the following additional information:

(a) For each piece of equipment to which subchapter BB of chapter 11-264 applies:
(1) Equipment identification number and hazardous waste management unit identification.
(2) Approximate locations within the facility (e.g., identify the hazardous waste management unit on a facility plot plan).
(3) Type of equipment (e.g., a pump or pipeline valve).
(4) Percent by weight total organics in the hazardous waste stream at the equipment.
(5) Hazardous waste state at the equipment (e.g., gas/vapor or liquid).
(6) Method of compliance with the standard (e.g., "monthly leak detection and repair'' or "equipped with dual mechanical seals'').
(b) For facilities that cannot install a closed-vent system and control device to comply with the provisions of chapter 11-264 subchapter BB on the effective date that the facility becomes subject to the provisions of chapter 11-264 or 11-265 subchapter BB, an implementation schedule as specified in paragraph 11-264-1033(a) (2).
(c) Where an owner or operator applies for permission to use a control device other than a thermal vapor incinerator, catalytic vapor incinerator, flare, boiler, process heater, condenser, or carbon adsorption system and chooses to use test data to determine the organic removal efficiency or the total organic compound concentration achieved by the control device, a performance test plan as specified in paragraph 11-264-1035(b) (3).
(d) Documentation that demonstrates compliance with the equipment standards in sections 11-264-1052 to 11-264-1059. This documentation shall contain the records required under section 11-264-1064. The director may request further documentation before deciding if compliance has been demonstrated.
(e) Documentation to demonstrate compliance with section 11-264-1060 shall include the following information:
(1) A list of all information references and sources used in preparing the documentation.
(2) Records, including the dates, of each compliance test required by subsection 11-264-1033(j).
(3) A design analysis, specifications, drawings, schematics, and piping and instrumentation diagrams based on the appropriate sections of "ATPI Course 415: Control of Gaseous Emissions'' (incorporated by reference as specified in section 11-260-11) or other engineering texts acceptable to the director that present basic control device design information. The design analysis shall address the vent stream characteristics and control device operation parameters as specified in subparagraph 11-264-1035(b) (4) (iii).
(4) A statement signed and dated by the owner or operator certifying that the operating parameters used in the design analysis reasonably represent the conditions that exist when the hazardous waste management unit is operating at the highest load or capacity level reasonably expected to occur.
(5) A statement signed and dated by the owner or operator certifying that the control device is designed to operate at an efficiency of ninety-five weight percent or greater.

Haw. Code R. § 11-270-25

[Eff 6/18/94; comp] (Auth: HRS §§ 342J-4, 342J-31, 342J-35) (Imp: 40 C.F.R. §270.25 )