Haw. Code R. § 11-270-24

Current through August, 2024
Section 11-270-24 - Specific Part B information requirements for process vents

Except as otherwise provided in section 11-264-1, owners and operators of facilities that have process vents to which subchapter AA of chapter 11-264 applies must provide the following additional information:

(a) For facilities that cannot install a closed-vent system and control device to comply with the provisions of chapter 11-264 subchapter AA on the effective date that the facility becomes subject to the provisions of chapter 11-264 or 11-265 subchapter AA, an implementation schedule as specified in paragraph 11-264-1033(a) (2).
(b) Documentation of compliance with the process vent standards in section 11-264-1032, including:
(1) Information and data identifying all affected process vents, annual throughput and operating hours of each affected unit, estimated emission rates for each affected vent and for the overall facility (i.e., the total emissions for all affected vents at the facility), and the approximate location within the facility of each affected unit (e.g., identify the hazardous waste management units on a facility plot plan).
(2) Information and data supporting estimates of vent emissions and emission reduction achieved by add-on control devices based on engineering calculations or source tests. For the purpose of determining compliance, estimates of vent emissions and emission reductions must be made using operating parameter values (e.g., temperatures, flow rates, or concentrations) that represent the conditions that exist when the waste management unit is operating at the highest load or capacity level reasonably expected to occur.
(3) Information and data used to determine whether or not a process vent is subject to the requirements of section 11-264-1032.
(c) Where an owner or operator applies for permission to use a control device other than a thermal vapor incinerator, catalytic vapor incinerator, flare, boiler, process heater, condenser, or carbon adsorption system to comply with the requirements of section 11-264-1032, and chooses to use test data to determine the organic removal efficiency or the total organic compound concentration achieved by the control device, a performance test plan as specified in paragraph 11-264-1035(b) (3).
(d) Documentation of compliance with section 11-264-1033, including:
(1) A list of all information references and sources used in preparing the documentation.
(2) Records, including the dates, of each compliance test required by subsection 11-264-1033(k).
(3) A design analysis, specifications, drawings, schematics, and piping and instrumentation diagrams based on the appropriate sections of "APTI Course 415: Control of Gaseous Emissions'' (incorporated by reference as specified in section 11-260-11) or other engineering texts acceptable to the director that present basic control device design information. The design analysis shall address the vent stream characteristics and control device operation parameters as specified in subparagraph 11-264-1035(b) (4) (iii).
(4) A statement signed and dated by the owner or operator certifying that the operating parameters used in the design analysis reasonably represent the conditions that exist when the hazardous waste management unit is or would be operating at the highest load or capacity level reasonably expected to occur.
(5) A statement signed and dated by the owner or operator certifying that the control device is designed to operate at an efficiency of ninety-five weight percent or greater unless the total organic emission limits of subsection 11-264-1032(a) for affected process vents at the facility can be attained by a control device involving vapor recovery at an efficiency less than ninety-five weight percent.

Haw. Code R. § 11-270-24

[Eff 6/18/94; comp] (Auth: HRS §§ 342J-4, 342J-31, 342J-35) (Imp: 40 C.F.R. §270.24 )