Strike Section 506.3.11 of the International Mechanical Code in its entirety and insert new Section 506.3.11 in the Mechanical Code in its place to read as follows:
Grease duct enclosures. A grease duct serving a Type I hood that penetrates a ceiling, wall, floor or any concealed spaces shall be enclosed from the point of penetration to the outlet terminal. A duct shall penetrate exterior walls only at locations where unprotected openings are permitted by the Building Code. The duct enclosure shall serve a single grease duct and shall not contain other ducts, piping or wiring systems. Duct enclosures shall have a fire-resistance rating of not less than that of the assembly penetrated and not less than 1 hour. Duct enclosures shall be as prescribed by Section 506.3.11.1, 506.3.11.2 or 506.3.11.3.
Strike Section 506.3.13.3 of the International Mechanical Code in its entirety and insert new Section 506.3.13.3 in the Mechanical Code in its place to read as follows:
Termination location. Exhaust outlets shall be located not less than 10 feet (3048 mm) horizontally from parts of the same or contiguous buildings, adjacent buildings and adjacent property lines and shall be located not less than 15 feet (4572 mm) above the adjoining grade level. Exhaust outlets shall be located not less than 20 feet (6096 mm) horizontally from or not less than 5 feet (1524 mm) above doors, operable windows and air intake openings into any building.
Exceptions:
When an approved odor and grease removal system is installed, termination is permitted in accordance with the requirements of Item 2 of Section 501.3.1 of the Mechanical Code, provided termination is not less than 15 feet (4572 mm) above the adjoining grade level.
D.C. Mun. Regs. tit. 12, r. 12-E506