Section 4 CCR 723-3-3919 - Installation of Protective Equipment by a Qualifying Facility to Accommodate Protection Equipment of a Utility
(a) Within 25 days after a qualifying facility submits its complete design information, a utility shall notify the qualifying facility of any necessity to install protective equipment to accommodate the utility's system protection equipment.
(b) Such notification shall be made in writing and shall list the specific types of protective equipment required and the operations of the utility which necessitate protection.
(c) The qualifying facility shall be responsible for installing protective equipment to accommodate the utility's system protection equipment. The cost of this installation shall be an interconnection cost of the qualifying facility.
(d) A utility shall not be responsible for the effects on a qualifying facility's equipment and systems that are caused by the utility's system or equipment.

4 CCR 723-3-3919

38 CR 17, September 10, 2015, effective 9/30/2015
39 CR 06, March 25, 2016, effective 4/14/2016
39 CR 08, April 25, 2016, effective 5/15/2016
40 CR 22, November 25, 2017, effective 12/15/2017
42 CR 03, February 10, 2019, effective 3/2/2019
42 CR 07, April 10, 2019, effective 4/30/2019
42 CR 09, May 10, 2019, effective 5/30/2019
43 CR 08, April 25, 2020, effective 5/15/2020
43 CR 12, June 25, 2020, effective 7/15/2020
43 CR 20, October 25, 2020, effective 11/14/2020
44 CR 13, July 10, 2021, effective 7/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 18, September 25, 2022, effective 10/15/2022
46 CR 02, January 25, 2023, effective 2/14/2023