Current through Register Vol. 47, No. 11, June 10, 2024
Section 4 CCR 723-3-3919 - Installation of Protective Equipment by a Qualifying Facility to Accommodate Protection Equipment of a Utility(a) Within 25 days after a qualifying facility submits its complete design information, a utility shall notify the qualifying facility of any necessity to install protective equipment to accommodate the utility's system protection equipment.(b) Such notification shall be made in writing and shall list the specific types of protective equipment required and the operations of the utility which necessitate protection.(c) The qualifying facility shall be responsible for installing protective equipment to accommodate the utility's system protection equipment. The cost of this installation shall be an interconnection cost of the qualifying facility.(d) A utility shall not be responsible for the effects on a qualifying facility's equipment and systems that are caused by the utility's system or equipment.38 CR 17, September 10, 2015, effective 9/30/201539 CR 06, March 25, 2016, effective 4/14/201639 CR 08, April 25, 2016, effective 5/15/201640 CR 22, November 25, 2017, effective 12/15/201742 CR 03, February 10, 2019, effective 3/2/201942 CR 07, April 10, 2019, effective 4/30/201942 CR 09, May 10, 2019, effective 5/30/201943 CR 08, April 25, 2020, effective 5/15/202043 CR 12, June 25, 2020, effective 7/15/202043 CR 20, October 25, 2020, effective 11/14/202044 CR 13, July 10, 2021, effective 7/30/202144 CR 24, December 25, 2021, effective 1/14/202245 CR 18, September 25, 2022, effective 10/15/202246 CR 02, January 25, 2023, effective 2/14/2023