Current through Register Vol. 47, No. 20, October 25, 2024
Section 4 CCR 723-3-3917 - Utility Access to Premises of a Qualifying Facility(a) A utility shall have access to a qualifying facility prior to construction to determine if minimum setback distances and physical clearances will be met for the safety of the utility's equipment. The cost of said inspection shall be included as an interconnection cost of the qualifying facility.(b) A utility shall have access to a qualifying facility to repair, to maintain, or to retrieve any of the utility's equipment affected by a failure of the utility's or qualifying facility's equipment.(c) A utility shall have access to a qualifying facility to conduct an inspection for the purpose stated in paragraph 3921(d).(d) A utility shall have access to a qualifying facility to conduct an inspection pursuant to the procedures established pursuant to paragraph 3927(b).(e) A utility shall have access to a qualifying facility to conduct an inspection pursuant to paragraph 3927(d).(f) A utility shall have access to a qualifying facility to conduct an inspection pursuant to paragraph 3927(e).38 CR 17, September 10, 2015, effective 9/30/201539 CR 06, March 25, 2016, effective 4/14/201639 CR 08, April 25, 2016, effective 5/15/201640 CR 22, November 25, 2017, effective 12/15/201742 CR 03, February 10, 2019, effective 3/2/201942 CR 07, April 10, 2019, effective 4/30/201942 CR 09, May 10, 2019, effective 5/30/201943 CR 08, April 25, 2020, effective 5/15/202043 CR 12, June 25, 2020, effective 7/15/202043 CR 20, October 25, 2020, effective 11/14/202044 CR 13, July 10, 2021, effective 7/30/202144 CR 24, December 25, 2021, effective 1/14/202245 CR 18, September 25, 2022, effective 10/15/202246 CR 02, January 25, 2023, effective 2/14/2023