The provisions of C.R.S. 25-8-202(1)(a), (b) and (2); 25-8-203; 25-8-204; and 25-8-402; provide the specific statutory authority for adoption of these regulatory amendments. The Commission also adopted in compliance with 24-4-103(4) C.R.S. the following statement of basis and purpose.
BASIS AND PURPOSE
Pursuant to the requirements in the Basic Standards (at 31.7(3)), the Commission reviewed the status of temporary modifications scheduled to expire before December 31, 2016, to determine whether the temporary modification should be modified, eliminated or extended.
Temporary modifications of standards on twelve segments were reviewed. The Commission took no action on the temporary modifications on the following segments.
Temporary modification of the selenium (type i) and sulfate (type i) standards: The City of Pueblo presented evidence indicating progress is being made on resolving the uncertainty regarding the underlying acute and chronic selenium and sulfate standards on Lower Arkansas segment 1a and chronic selenium on Lower Arkansas segment 1b. The Commission made no change to the expiration date of 6/30/2016 as the original time allotment was deemed adequate.
Temporary modification of the temperature standard (type B) for various segments in the Purgatoire Basin: The Commission made no change to the expiration date of 6/30/2016 as the original time allotment was deemed adequate to resolve the uncertainty for the following Lower Arkansas River Segments: 3a, 3b, 4b, 5b, 5c, 6a, 6b, 15, 16 and 17.
PARTIES TO THE RULEMAKING HEARING
5 CCR 1002-32.54