6 Colo. Code Regs. § 1007-3-100.5.503

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-3-100.5.503 - FACT SHEET
(a) A fact sheet shall be prepared for every draft permit for a major HWM facility or activity, and for every draft permit which the Director finds is the subject of widespread public interest or raises major issues. The fact sheet shall briefly set forth the principal facts and the significant factual, legal, methodological and policy questions considered in preparing the draft permit. The Director shall send this fact sheet to the applicant and, on request, to any other person.
(b) The fact sheet shall include, when applicable:
(1) A brief description of the type of facility or activity which is the subject of the draft permit;
(2) The type and quantity of wastes which are proposed to be or are being treated, stored, or disposed.
(3) A brief summary of the basis for the draft permit conditions including references to applicable statutory or regulatory provisions and appropriate supporting references to the administrative record required by § 100.505;
(4) Reasons why any requested variances or alternatives to required standards do or do not appear justified;
(5) A description of the procedures for reaching a final decision on the draft permit including:
(i) The beginning and ending dates of the comment period under § 100.506 and the address where comments will be received;
(ii) Procedures for requesting a hearing and the nature of that hearing; and
(iii) Any other procedures by which the public may participate in the final decision.
(6) Name and telephone number of a person to contact for additional information.

6 CCR 1007-3-100.5.503

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023