6 Colo. Code Regs. § 1007-3-100.5.502

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-3-100.5.502 - DRAFT PERMITS
(a) Once an application is complete, the Director shall tentatively decide whether to prepare a draft permit or to deny the application.
(b) If the Director tentatively decides to deny the permit application, he or she should issue a notice of intent to deny within 6 months of receipt of a completed application. A notice of intent to deny the permit application is a type of draft permit which follows the same procedures as any draft permit prepared under this section. See § 100.502(d). If the Director's final decision (§ 100.511) is that the tentative decision to deny the permit application was incorrect, he or she shall withdraw the notice of intent to deny and proceed to prepare a draft permit under paragraph (c) of this section.
(c) If the Director decides to prepare a draft permit, he or she should prepare a draft permit within 6 months of receipt of a completed application. The draft permit shall contain the following information:
(1) All conditions under § 100.42 (Generally Applicable Permit Conditions).
(2) All applicable conditions under § 100.43 (Establishing Permit Conditions for Individual Permits).
(d) All draft permits prepared under this section shall be accompanied by a statement of basis (§ 100.504) or fact sheet (§ 100.503), shall be based on the administrative record (§ 100.505), publicly noticed (§ 100.506), and made available for public comment (§ 100.507). The Director shall give notice of opportunity for a public hearing (§ 100.508), render a final decision (§ 100.511), and respond to comments (§ 100.512).

6 CCR 1007-3-100.5.502

37 CR 24, December 25, 2014, effective 3/2/2015
38 CR 11, June 10, 2015, effective 6/30/2015
39 CR 05, March 10, 2016, effective 3/30/2016
39 CR 11, June 10, 2016, effective 6/30/2016
40 CR 06, March 25, 2017, effective 4/14/2017
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 21, November 10, 2017, effective 11/30/2017
41 CR 06, March 25, 2018, effective 4/14/2018
41 CR 11, June 10, 2018, effective 6/30/2018
41 CR 24, December 25, 2018, effective 1/14/2019
42 CR 06, March 25, 2019, effective 4/14/2019
42 CR 06, March 25, 2019, effective 5/30/2019
42 CR 11, June 10, 2019, effective 6/30/2019
43 CR 12, June 25, 2020, effective 7/15/2020
44 CR 06, March 25, 2021, effective 4/14/2021
44 CR 11, June 10, 2021, effective 6/30/2021
44 CR 24, December 25, 2021, effective 1/14/2022
45 CR 11, June 10, 2022, effective 6/30/2022
45 CR 17, September 10, 2022, effective 9/10/2022
45 CR 17, September 10, 2022, effective 9/30/2022
45 CR 23, December 10, 2022, effective 1/30/2023