Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-1-22.26 - Preplanning and Coordination of Shipment of Category 1 or Category 2 Quantities of Radioactive Material22.26.1 Each licensee that plans to transport, or deliver to a carrier for transport, licensed material that is a category 1 quantity of radioactive material outside the confines of the licensee's facility or other place of use or storage shall: A. Preplan and coordinate shipment arrival and departure times with the receiving licensee;B. Preplan and coordinate shipment information with the governor or the governor's designee of any State through which the shipment will pass to:1. Discuss the State's intention to provide law enforcement escorts; and2. Identify safe havens; andC. Document the preplanning and coordination activities.22.26.2 Each licensee that plans to transport, or deliver to a carrier for transport, licensed material that is a category 2 quantity of radioactive material outside the confines of the licensee's facility or other place of use or storage shall coordinate the shipment no-later-than arrival time and the expected shipment arrival with the receiving licensee. The licensee shall document the coordination activities.22.26.3 Each licensee who receives a shipment of a category 2 quantity of radioactive material shall confirm receipt of the shipment with the originator. If the shipment has not arrived by the no-later-than arrival time, the receiving licensee shall notify the originator.22.26.4 Each licensee, who transports or plans to transport a shipment of a category 2 quantity of radioactive material, and determines that the shipment will arrive after the no-later-than arrival time provided pursuant to 22.26.2., shall promptly notify the receiving licensee of the new no-later-than arrival time.22.26.5 The licensee shall retain a copy of the documentation for preplanning and coordination and any revision thereof, as a record for 3 years.Colorado Register, Vol 37, No. 14. July 25, 2014, effective 8/14/201438 CR 02, January 25, 2015, effective 2/14/201538 CR 05, March 10, 2015, effective 3/30/201538 CR 12, June 25, 2015, effective 7/15/201538 CR 14, July 25, 2015, effective 8/14/201539 CR 02, January 25, 2016, effective 2/14/201639 CR 16, August 25, 2016, effective 9/14/201639 CR 22, November 25, 2016, effective 12/15/201640 CR 11, June 10, 2017, effective 6/30/201740 CR 20, October 25, 2017, effective 11/14/201742 CR 24, December 25, 2019, effective 1/14/202043 CR 14, July 25, 2020, effective 8/14/202043 CR 18, September 25, 2020, effective 10/15/202044 CR 11, June 10, 2021, effective 7/15/202144 CR 14, July 25, 2021, effective 8/14/202145 CR 22, November 25, 2022, effective 12/15/2022