6 Colo. Code Regs. § 1007-1-22.25

Current through Register Vol. 47, No. 11, June 10, 2024
Section 6 CCR 1007-1-22.25 - Applicability of Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material During Transit
22.25.1 For shipments of category 1 quantities of radioactive material, each shipping licensee shall comply with the requirements for physical protection contained in 22.26.1. and 22.26.5.; 22.27; 22.28.1.A., 22.28.2.A. and 22.28.3.; and 22.29.1., 22.29.3., 22.29.5., 22.29.7., and 22.29.8.
22.25.2 For shipments of category 2 quantities of radioactive material, each shipping licensee shall comply with the requirements for physical protection contained in 22.26.2. through 22.26.5.; 22.28.1.B., 22.28.1.C., 22.28.2.B., and 22.28.3.; and 22.29.2., 22.29.4., 22.29.6., 22.29.7., and 22.29.8. For those shipments of category 2 quantities of radioactive material that meet the criteria of Part 17, Section 17.11, the shipping licensee shall also comply with the advance notification provisions of Part 17, Section 17.11.
22.25.3 The shipping licensee shall be responsible for meeting the requirements of section D of this part unless the receiving licensee has agreed in writing to arrange for the in-transit physical protection required under section D of this part.
22.25.4 Each licensee that imports or exports category 1 quantities of radioactive material shall comply with the requirements for physical protection during transit contained in 22.26.1.B. 22.26.5.; 22.27; 22.28.1.A., 22.28.2.A., 22.28.3.; and 22.29.1., 22.29.3., 22.29.5., 22.29.7., and 22.29.8. for the domestic portion of the shipment.
22.25.5 Each licensee that imports or exports category 2 quantities of radioactive material shall comply with the requirements for physical protection during transit contained in 22.28.1.B., 22.28.1.C., 22.28.2.B.; and 22.29.2., 22.29.4., 22.29.6., 22.29.7. and 22.29.8. for the domestic portion of the shipment.

6 CCR 1007-1-22.25

Colorado Register, Vol 37, No. 14. July 25, 2014, effective 8/14/2014
38 CR 02, January 25, 2015, effective 2/14/2015
38 CR 05, March 10, 2015, effective 3/30/2015
38 CR 12, June 25, 2015, effective 7/15/2015
38 CR 14, July 25, 2015, effective 8/14/2015
39 CR 02, January 25, 2016, effective 2/14/2016
39 CR 16, August 25, 2016, effective 9/14/2016
39 CR 22, November 25, 2016, effective 12/15/2016
40 CR 11, June 10, 2017, effective 6/30/2017
40 CR 20, October 25, 2017, effective 11/14/2017
42 CR 24, December 25, 2019, effective 1/14/2020
43 CR 14, July 25, 2020, effective 8/14/2020
43 CR 18, September 25, 2020, effective 10/15/2020
44 CR 11, June 10, 2021, effective 7/15/2021
44 CR 14, July 25, 2021, effective 8/14/2021
45 CR 22, November 25, 2022, effective 12/15/2022