780 CMR, ch. 51, ch. 5, RB103, RB103.7

Current through Register 1538, January 3, 2025
Subsection RB103.7 - Construction documentation certificate

Delete RB103.7 Electrical service reserved space and Renumber section RB103.8 as RB103.7, as shown below:

A permanent certificate, indicating the solar-ready zone and other requirements of this section, shall be posted near the electrical distribution panel, water heater or other conspicuous location by the builder or registered design professional.

780 CMR, ch. 51, ch. 5, RB103, RB103.7

Amended by Mass Register Issue 1532, eff. 10/11/2024.