Revise and replace section RB103.4 Obstructions as follows:
Solar-ready zones shall consist of an area free from obstructions, including but not limited to vents, chimneys, and roof-mounted equipment.
NOTE: Nothing in RA103.4 shall require any construction documents to be redesigned or reconfigured so as to create a solar-ready zone area.
780 CMR, ch. 51, ch. 5, RB103, RB103.4