In the event the Monitoring Program projects Overscheduling conditions that would result in Peak Period conditions, the Authority will provide to the FAA and to each Operator conducting scheduled commercial air transportation service at BOS registered with the Office of the Authority's Aviation Director advance notice of the Authority's intent to impose a Peak Period surcharge, absent elimination of such projected overscheduling conditions, and the anticipated level of such surcharge. Such notice shall be provided up to six months in advance of the declaration of Peak Period conditions, if feasible. Such notice shall also be provided to each Fixed Base Operator and shall be posted in the General Aviation Terminal at BOS.
This notice is intended to provide:
740 CMR, § 27.04