310 CMR, § 30.544

Current through Register 1536, December 6, 2024
Section 30.544 - Biennial Report

The owner or operator of any facility subject to licensing pursuant to 310 CMR 30.801 shall prepare and submit a copy of a Biennial Report to the Commissioner by March 1st of each even numbered year. The Biennial Report shall be submitted on EPA Form 8700-13A. The report shall cover facility activities during the previous calendar year and shall include, at a minimum, the following information:

(1) The EPA identification number, name, and address of the facility, and the name and telephone number of the principal contact at the facility.
(2) The calendar year covered by the report.
(3) For facilities that receive any hazardous waste from any off-site source, the EPA identification number of each hazardous waste generator from which the facility received a hazardous waste during the year; for imported shipments, the report shall include the name and address of the foreign generator.
(4) A description of and the quantity of each hazardous waste the facility treated, stored or disposed of during the year; for facilities that receive any hazardous waste from any off-site source, this information must be listed by the EPA identification number of each generator.
(5) The method of treatment, storage, or disposal for each hazardous waste.
(6) The most recent closure cost estimate made pursuant to 310 CMR 30.580 through 30.586 and, if applicable, the most recent post-closure cost estimate made pursuant to 310 CMR 30.590 through 30.595.
(7) For generators who treat, store, or dispose of hazardous waste on-site, a description of the efforts undertaken during the year to reduce the volume and toxicity of waste generated.
(8) For generators who treat, store, or dispose of hazardous waste on-site, a description of the changes in volume and toxicity of waste actually achieved during the year in comparison to previous years to the extent such information is available for the years prior to 1984.
(9) A summary of every incident that required implementing the contingency plan.
(10) The certification signed by the owner or operator of the facility or his authorized representative pursuant to 310 CMR 30.009.

310 CMR, § 30.544