40 C.F.R. § 63 app Table 4 to Subpart HHHHHHH of Part 63

Current through May 31, 2024
Appendix Table 4 to Subpart HHHHHHH of Part 63 - Applicability of the General Provisions to Part 63

Citation Subject Applies to subpart HHHHHHH Comment
§ 63.1(a)(1)-(a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (c)(6), (e) ApplicabilityYes
§ 63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) [Reserved]No.
§ 63.2 DefinitionsYesAdditional definitions are found in § 63.12005 .
§ 63.3 Units and abbreviationsYes.
§ 63.4(a)(1), (a)(2), (b), (c) Prohibited activities and circumventionYes.
§ 63.4(a)(3)-(a)(5) [Reserved]No.
§ 63.5(a), (b)(1), (b)(3), (b)(4), (b)(6), (d)-(f) Preconstruction review and notification requirementsYes.
§ 63.5(b)(2), (b)(5), (c) [Reserved]No.
§ 63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1)(iii), (f)(2), (f)(3), (g), (i), (j) Compliance with standards and maintenance requirementsYes§ 63.11875 specifies compliance dates.
§ 63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(2)(ii), (h)(3), (h)(5)(iv) [Reserved]No
§ 63.6(e)(1)(i), (e)(1)(ii), (e)(3), (f)(1) Startup, shutdown, and malfunction provisionsNo. See § 63.11890(b) for general duty requirement
§ 63.6(h)(1), (h)(2)(i), (h)(2)(iii), (h)(4), (h)(5)(i)-(h)(5)(iii), (h)(5)(v), (h)(6)-(h)(9) Compliance with opacity and visible emission standardsNoSubpart HHHHHHH does not specify opacity or visible emission standards.
§ 63.7(a)(1), (a)(2), (a)(3), (a)(4), (b)-(d), (e)(2)-(e)(4), (f), (g)(1), (g)(3), (h) Performance testing requirementsYes.
§ 63.7(a)(2)(i) -(viii)[Reserved]No.
§ 63.7(a)(2)(ix) Performance testing requirementsYes.
§ 63.7(e)(1) Performance testingNo. See especially § 63.11945 , 63.11960(d) , 63.11980(a)
§ 63.7(g)(2) [Reserved]No.
§ 63.8(a)(1), (a)(2), (a)(4), (b), (c)(1)(i), (c)(1)(ii), (c)(2)-(c)(4), (c)(6)-(c)(8) Monitoring requirementsYesExcept cross reference in § 63.8(c)(1)(i) to § 63.6(e)(1) is replaced with a cross-reference to § 63.11890(b) .
§ 63.8(a)(3) [Reserved]No.
§ 63.8(c)(1)(iii) Requirement to develop SSM plan for continuous monitoring systemsNo.
§ 63.8(c)(5) Continuous opacity monitoring system minimum proceduresNoSubpart HHHHHHH does not have opacity or visible emission standards.
§ 63.8(d) Written procedures for continuous monitoring systemsYes, except for last sentence, which refers to an SSM plan. SSM plans are not required
§ 63.8(e) Continuous monitoring systems performance evaluationYes.
§ 63.8(f) Use of an alternative monitoring methodYes.
§ 63.8(g) Reduction of monitoring dataYesExcept that the minimum data collection requirements are specified in § 63.11935(e) .
§ 63.9(a), (b)(1), (b)(2), (b)(4)(i), (b)(4)(v), (b)(5), (c)-(e), (g)(1), (g)(3), (h)(1)-(h)(3), (h)(5), (h)(6), (i), (j) Notification requirementsYes.
§ 63.9(f) Notification of opacity and visible emission observationsNoSubpart HHHHHHH does not have opacity or visible emission standards.
§ 63.9(g)(2) Use of continuous opacity monitoring system dataNoSubpart HHHHHHH does not require the use of continuous opacity monitoring system.
§ 63.9(b)(3), (b)(4)(ii)-(iv), (h)(4) [Reserved]No.
§ 63.9(k) Electronic reporting proceduresYesOnly as specified in § 63.9(j) .
§ 63.10(a), (b)(1) Recordkeeping and reporting requirementsYes.
§ 63.10(b)(2)(i) Recordkeeping of occurrence and duration of startups and shutdownsNo.
§ 63.10(b)(2)(ii) Recordkeeping of malfunctionsNo. See §§ 63.11895(b) , 63.11985(b)(4)(i) , 63.11985(b)(9) through (11) , and 63.11985(c)(7)
§ 63.10(b)(2)(iii) Maintenance recordsYes.
§ 63.10(b)(2)(iv), (b)(2)(v) Actions taken to minimize emissions during SSMNo.
§ 63.10(b)(2)(vi) Recordkeeping for CMS malfunctionsYes.
§ 63.10(b)(2)(vii)-(x) Other CMS requirementsYes.
§ 63.10(b)(2)(xi)-(xiv) Other recordkeeping requirementsYes.
§ 63.10(b)(3) Recordkeeping requirement for applicability determinationsYes.
§ 63.10(c)(1), (c)(5), (c)(6) Additional recordkeeping requirements for sources with continuous monitoring systemsYes.
§ 63.10(c)(2)-(4), (c)(9) [Reserved]No.
§ 63.10(c)(7) Additional recordkeeping requirements for CMS-identifying exceedances and excess emissions during SSMYes.
§ 63.10(c)(8) Additional recordkeeping requirements for CMS-identifying exceedances and excess emissionsYes.
§ 63.10(c)(10) Recording nature and cause of malfunctionsNo. See §§ 63.11895(b) , 63.11985(b)(4)(i) , 63.11985(b)(9) through (11) , and 63.11985(c)(7)
63.10(c)(11), (c)(12)Recording corrective actionsNo. See §§ 63.11895(b) , 63.11985(b)(4)(i) , 63.11985(b)(9) through (11) , and 63.11985(c)(7)
§ 63.10(c)(13)-(14) Records of the total process operating time during the reporting period and procedures that are part of the continuous monitoring system quality control programYes.
§ 63.10(c)(15) Use SSM planNo.
§ 63.10(d)(1) General reporting requirementsYes.
§ 63.10(d)(2) Performance test resultsYes.
§ 63.10(d)(3) Opacity or visible emissions observationsNoSubpart HHHHHHH does not specify opacity or visible emission standards.
§ 63.10(d)(4) Progress reportsYes.
§ 63.10(d)(5) SSM reportsNo. See §§ 63.11895(b) , 63.11985(b)(4)(i) , 63.11985(b)(9) through (11) , and 63.11985(c)(7)
§ 63.10(e)(1) Additional continuous monitoring system reports-generalYes.
§ 63.10(e)(2)(i) Results of continuous monitoring system performance evaluationsYes.
§ 63.10(e)(2)(ii) Results of continuous opacity monitoring system performance evaluationsNoSubpart HHHHHHH does not require the use of continuous opacity monitoring system.
§ 63.10(e)(3) Excess emissions/continuous monitoring system performance reportsYes.
§ 63.10(e)(4) Continuous opacity monitoring system data reportsNoSubpart HHHHHHH does not require the use of continuous opacity monitoring system.
§ 63.10(f) Recordkeeping/reporting waiverYes.
63.11(a)Control device and work practice requirements-applicabilityYes.
§ 63.11(b) FlaresNoFacilities subject to subpart HHHHHHH do not use flares as control devices, as specified in § 63.11925(b) .
§ 63.11(c)-(e) Alternative work practice for monitoring equipment for leaksYes.
§ 63.12 State authority and delegationsYes§ 63.12000 identifies types of approval authority that are not delegated.
§ 63.13 AddressesYes.
§ 63.14 Incorporations by referenceYesSubpart HHHHHHH incorporates material by reference.
§ 63.15 Availability of information and confidentialityYes.
§ 63.16 Performance track provisionsYes.

40 C.F.R. 63 app Table 4 to Subpart HHHHHHH of Part 63

77 FR 22906, Apr. 17, 2012, as amended at 85 FR 73921, Nov. 19, 2020
85 FR 73921, 1/19/2021