40 C.F.R. § 63.1662-63 app Table 8 to Subpart AAAAA of Part 63

Current through May 31, 2024
Appendix Table 8 to Subpart AAAAA of Part 63 - Requirements for Reports

As required in § 63.7131 , you must submit each report in this table that applies to you.

You must submit a . . .The report must contain . . .You must submit the report . . .
1. Compliance reporta. If there are no deviations from any emission limitations (emission limit, operating limit, opacity limit, and VE limit) that applies to you, a statement that there were no deviations from the emission limitations during the reporting period;Semiannually according to the requirements in § 63.7131(b) .
b. If there were no periods during which the CMS, including any operating parameter monitoring system, was out-of-control as specified in § 63.8(c)(7) , a statement that there were no periods during which the CMS was out-of-control during the reporting period;Semiannually according to the requirements in § 63.7131(b) .
c. If you have a deviation from any emission limitation (emission limit, operating limit, opacity limit, and VE limit) during the reporting period, the report must contain the information in § 63.7131(d) ;Semiannually according to the requirements in § 63.7131(b) .
d. If there were periods during which the CMS, including any operating parameter monitoring system, was out-of-control, as specified in § 63.8(c)(7) , the report must contain the information in § 63.7131(e) ; andSemiannually according to the requirements in § 63.7131(b) .
e. Before the relevant compliance date for your source as specified in § 63.7083(e) , if you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your SSMP, the compliance report must include the information in § 63.10(d)(5)(i) . On and after the relevant compliance date for your source as specified in § 63.7083(e) , if you had a startup, shutdown or malfunction during the reporting period and you failed to meet an applicable standard, the compliance report must include the information in § 63.7131(c)(3) Semiannually according to the requirements in § 63.7131(b) .
2. Before the relevant compliance date for your source as specified in § 63.7083(e) , an immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent with your SSMPActions taken for the eventBy fax or telephone within 2 working days after starting actions inconsistent with the SSMP.
3. Before the relevant compliance date for your source as specified in § 63.7083(e) , an immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent with your SSMPThe information in § 63.10(d)(5)(ii) By letter within 7 working days after the end of the event unless you have made alternative arrangements with the permitting authority. See § 63.10(d)(5)(ii) .
(4) Performance Test ReportThe information required in § 63.7(g) According to the requirements of § 63.7131 .

40 C.F.R. 63.1662-63 app Table 8 to Subpart AAAAA of Part 63

85 FR 44987, July 24, 2020