The hoisting engineer shall not move the cage, skip or bucket until a signal is received and he completely understands the signal.
Ariz. Admin. Code § R11-1-1145
The hoisting engineer shall not move the cage, skip or bucket until a signal is received and he completely understands the signal.
Ariz. Admin. Code § R11-1-1145