Browse as ListSearch Within- Section R11-1-1101 - Construction of Headframes and Material Used
- Section R11-1-1102 - Design of Headframes
- Section R11-1-1103 - Headframes Constructed of Flammable Material
- Section R11-1-1104 - The Sheave Wheel Platform and Stairway
- Section R11-1-1105 - Reserved
- Section R11-1-1106 - Maintenance of Information Contained in Rope Record Book for Friction Hoists
- Section R11-1-1107 - Safety Factors for Friction Hoist Ropes, Tail Ropes, and Guide and Rubbing Ropes
- Section R11-1-1108 - Use of Hoisting Rope, Tail Rope, Guide or Rubbing Rope on Friction Hoist
- Section R11-1-1109 - Drum Diameter of Friction Hoist
- Section R11-1-1110 - Design of Friction Hoist Drives, Controls, and Brakes
- Section R11-1-1111 - Inspection of Friction Hoist Rope Treads
- Section R11-1-1112 - Installation of Tapered Guides or Other Approved Installations on Friction Hoists
- Section R11-1-1113 - Emergency Stopping Device for Friction Hoists
- Section R11-1-1114 - Emergency Stopping Device Provided for Friction Hoists when Tail Rope Is Used
- Section R11-1-1115 - Means Provided to Adjust Depth Indicator on Friction Hoist
- Section R11-1-1116 - Level of Water and Spillage in Shaft Sump when Friction Hoist Used
- Section R11-1-1117 - Positions of Hoisting Ropes within Clamps, for Friction Hoists, Examined
- Section R11-1-1118 - Manufacturer Shall Provide Certificate Giving Maximum Rated Unbalanced Load and Maximum Rated Suspended Load for Friction Hoist
- Section R11-1-1119 - Alterations of Friction Hoist Capacity Prohibited
- Section R11-1-1120 - Determination of Maximum Material Load Allowed on Conveyance of Friction Hoist
- Section R11-1-1121 - Inspection of Shafts Used for Hoisting or Lowering Men
- Section R11-1-1122 - Protection from Falling Ground
- Section R11-1-1123 - [REPEALED]
- Section R11-1-1124 - Platform Suspended by Wire Ropes in Shaft Sinking
- Section R11-1-1125 - Rope Guides
- Section R11-1-1126 - Substantial Platforms Required for Shaft Inspection and Repair Work
- Section R11-1-1127 - Use of Crane in Shaft Sinking Operations
- Section R11-1-1128 - Reserved
- Section R11-1-1129 - Reserved
- Section R11-1-1130 - Reserved
- Section R11-1-1131 - Mine Hoist Drives
- Section R11-1-1132 - Rated Capacities of Hoists
- Section R11-1-1133 - Automatic Hoists
- Section R11-1-1134 - Flanges on Drums
- Section R11-1-1135 - Maximum Fleet Angle
- Section R11-1-1136 - Brakes on Man Hoists
- Section R11-1-1137 - Lock Mechanism on Hoists to Prevent Accidental Clutch Withdrawal
- Section R11-1-1138 - Devices for Man Hoists to Prevent Overtravel
- Section R11-1-1139 - Indicator of Cage, Skip Bucket or Cars
- Section R11-1-1140 - Placement of Hoist Controls
- Section R11-1-1141 - Physical Examination for Hoisting Engineers and Trainees
- Section R11-1-1142 - Hoisting Engineer's Duties While Hoist in Motion
- Section R11-1-1143 - Due Caution While Hoist in Motion
- Section R11-1-1144 - Hoisting Engineer Report All Defects
- Section R11-1-1145 - Hoisting Engineer Must Understand Signal
- Section R11-1-1146 - If Hoist down for Eight Hours
- Section R11-1-1147 - Hoisting Engineer Qualifications
- Section R11-1-1148 - Experienced Hoistmen Shall Operate Hoist
- Section R11-1-1149 - Hoisting Engineer Shall Familiarize Himself with All Signals
- Section R11-1-1150 - Notification to Hoisting Engineer when Men Are Working in Compartment
- Section R11-1-1151 - Renumbered
- Section R11-1-1152 - Hoist Ropes Inspected
- Section R11-1-1153 - Discarding of Wire Cable or Rope Used for Hoisting
- Section R11-1-1154 - Splicing Wire Cable or Hoisting Rope
- Section R11-1-1155 - Static-load Safety Factors for Selecting Ropes for Hoisting Men
- Section R11-1-1156 - Attaching the Rope to the Load
- Section R11-1-1157 - Inspection of Materials
- Section R11-1-1158 - Use of Emergency Chains
- Section R11-1-1159 - Signal by the Cager
- Section R11-1-1160 - Cagers Shall Report All Defects
- Section R11-1-1161 - Getting on Cages
- Section R11-1-1162 - After Signal Given to Move Cage
- Section R11-1-1163 - Signal to Move Cage
- Section R11-1-1164 - Use of Metal Bonnet
- Section R11-1-1165 - Providing Means for Blocking Cars when Hoisted
- Section R11-1-1166 - Reporting Materials or Tools Dropped in Shaft
- Section R11-1-1167 - Hoisting Materials or Tools
- Section R11-1-1168 - Testing of Safety Devices
- Section R11-1-1169 - Smoking on Conveyance Used to Lower or Hoist Men, Ore or Equipment
- Section R11-1-1170 - No Open Hooks Used to Hoist
- Section R11-1-1171 - Use of Buckets to Hoist Men
- Section R11-1-1172 - Buckets to Hoist Men during Shaft Sinking
- Section R11-1-1173 - Lowering of Conveyances
- Section R11-1-1174 - Hoisting Materials and Men in Same Shaft
- Section R11-1-1175 - Lowering and Hoisting Buckets
- Section R11-1-1176 - Approved Methods of Signaling
- Section R11-1-1177 - Gates for Shaft Landings
- Section R11-1-1178 - Stop Blocks
- Section R11-1-1179 - Getting on or off Moving Cage
- Section R11-1-1180 - Method Provided to Signal Hoist Operator from Cage
- Section R11-1-1181 - Reserved
- Section R11-1-1182 - Diesel or Fuel-injection Engine Used to Power Hoist
- Section R11-1-1183 - Renumbered
- Section R11-1-1184 - Cable Secured to Hoist Drum
- Section R11-1-1185 - Location of Hoisting Signal Devices during Shaft Sinking
- Section R11-1-1186 - Construction of Loading Pockets
- Section R11-1-1187 - Reserved
- Section R11-1-1188 - Reserved
- Section R11-1-1189 - Reserved
- Section R11-1-1190 - Elevator Inspection