Clean Air Act (CAA) Full Approval of Operating Permits Program and Approval and Promulgation of Implementation Plans; State of Arkansas; New Source Review (NSR)

Download PDF
Federal RegisterOct 9, 2001
66 Fed. Reg. 51312 (Oct. 9, 2001)

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Direct final rule.

SUMMARY:

The EPA is taking direct final action to fully approve the Operating Permit Program of the State of Arkansas and to also approve this rule as it pertains to the Arkansas State Implementation Plan (SIP). Arkansas' Operating Permit Program was submitted in response to the directive in the 1990 CAA Amendments that States develop, and submit to EPA, programs for issuing operating permits to all major stationary sources and to certain other sources within the States' jurisdiction. The EPA granted interim approval to Arkansas' Operating Permit Program on September 8, 1995. Arkansas revised its program to satisfy the conditions of the interim approval, and this action approves those revisions. Regulation 26, the Regulation of the Arkansas Operating Air Permit Program, is a comprehensive State air quality program which is designed to address all applicable air contaminant emissions and regulatory requirements in a single permit document; as such it incorporates the NSR permitting requirements for major sources, as defined by title V, CAA section 501-507, 42 U.S.C. 7661-7661f. The EPA is also approving the revised and recodified Regulation 26 as it pertains to the Arkansas SIP.

DATES:

This direct final rule is effective on December 10, 2001 without further notice unless EPA receives adverse comments in writing by November 8, 2001. If adverse comment is received, EPA will publish a timely withdrawal of this direct final rule in the Federal Register and inform the public that the rule will not take effect. The public comments will be addressed in a subsequent final rule based on the proposed rule published in this Federal Register.

ADDRESSES:

Written comments on this action should be addressed to Ms. Jole C. Luehrs, Chief, Air Permits Section (6PD-R), at the EPA Region 6 Office listed below. Copies of documents relevant to this action, including the Technical Support Document and documents related to the fee demonstration, are available for public inspection during normal business hours at the following locations:

EPA, Region 6, Air Permits Section (6PD-R), 1445 Ross Avenue, Dallas, Texas 75202-2733.

Arkansas Department of Environmental Quality, Division of Air Pollution Control, 8001 National Drive, P.O. Box 8913, Little Rock, Arkansas 72219-8913.

Anyone wanting to examine these documents should make an appointment with the appropriate office at least two working days in advance.

FOR FURTHER INFORMATION CONTACT:

Mr. Daron Page, EPA, Region 6, at (214) 665-7222.

SUPPLEMENTARY INFORMATION:

Throughout this document “we,” “us,” or “our” means EPA. This section provides additional information by addressing the following questions:

I. Title V Operating Permit Program

A. What is the operating permit program?

B. What is being addressed in this document?

C. What are the program changes that EPA is approving?

D. What is involved in this final action?

II. State Implementation Plan (SIP)

A. What is a SIP?

B. What is the Federal approval process for a SIP?

C. What Does Federal approval of a State regulation mean to me?

D. What is being addressed in this action?

E. Why is EPA approving the NSR provisions of Regulation 26 into the Arkansas SIP?

F. Have the requirements for approval of a SIP revision been met?

G. What action is EPA taking?

III. Conclusion

IV. Administrative Requirements

I. Title V Operating Permit Program

A. What Is the Operating Permit Program?

The CAA Amendments of 1990 require all States to develop Operating Permit Programs that meet certain Federal criteria. In implementing the Operating Permit Programs, the permitting authorities require certain sources of air pollution to obtain permits that contain all applicable requirements under the CAA. The focus of the Operating Permit Program is to facilitate compliance and improve enforcement by issuing each source a permit that consolidates all of the applicable CAA requirements into a Federally enforceable document. By consolidating all of the applicable requirements for a facility into a single document, the source, the public, and the regulators can more easily determine what CAA requirements apply and how compliance with those requirements is determined.

Sources required to obtain an operating permit under this program include “major” sources of air pollution as defined by title V. For example, all sources regulated under the acid rain program, regardless of size, must obtain operating permits. Examples of major sources include those that have the potential to emit 100 tons per year (tpy) or more of volatile organic compounds, carbon monoxide, lead, sulfur dioxide, nitrogen oxides, or particulate matter nominally 10 microns and less (PM10); those that emit 10 tpy of any single hazardous air pollutant (specifically listed under the CAA); or those that emit 25 tpy or more of a combination of hazardous air pollutants (HAPs). In areas that are not meeting the National Ambient Air Quality Standards for ozone, carbon monoxide, or particulate matter, major sources are defined by the gravity of the nonattainment classification. There are currently no areas classified as nonattainment in Arkansas.

B. What Is Being Addressed in This Document?

Where an Operating Permit Program substantially, but not fully, met the criteria outlined in the implementing regulations codified at 40 CFR part 70, EPA granted interim approval contingent on the State revising its program to correct the deficiencies. Because Arkansas' Operating Permit Program substantially, but not fully, met the requirements of part 70, EPA granted interim approval to the program in a rulemaking published on September 8, 1995 (60 FR 46771). In this Federal Register document, EPA identified three deficiencies that needed to be addressed before the State could receive full approval (60 FR 46773). Arkansas submitted revisions to its interim approved Operating Permit Program on August 4, 2000. This document describes the changes that have been made to Arkansas' Operating Permit Program.

C. What Are the Program Changes That EPA Is Approving?

The first condition for full approval of Arkansas' Operating Permit Program was that the State was required to amend Regulations 26.4 and 26.7 to incorporate the date of promulgation of the rule at 40 CFR part 70. The purpose of this requirement was to make clear that the permit application and permit content were fully incorporated into the State's regulations (60 FR 46773). Instead, the State chose to incorporate the language for the permit application and permit content directly into their regulation. We agree that revising Regulation 26.402 to include the language from 40 CFR 70.5(c) and revising Regulations 26.701-26.703 to include the language from 40 CFR 70.6(a)-(c) corrects this deficiency.

The second condition for full approval of Arkansas' Operating Permit Program was that the language in the State's Regulation 26.10(B)(1) regarding emission levels must be deleted to make the regulation consistent with the Federal rule at 40 CFR 70.7(e)(2)(i)(A) and the State's Regulations 26.10(b)(7) and 19.2. Id. Regulation 26.10(B)(1) (now Regulation 26.1002(A)) provided that “increases of not over 20% of the applicable definition of major source, or 15 tpy of PM10 or 0.6 tpy of lead (potential to emit basis), whichever is less, of a regulated air pollutant over permitted rates” could be processed as a minor permit modification. Regulation 19.2 defined a modification as any increase in emissions. Thus, EPA believed that the Arkansas minor permit modification process was inconsistent with itself and 40 CFR part 70.

The reference to section 19.2 refers to a designation in Regulation 19 on the date of our interim approval of Arkansas' title V Operating Permit Program on September 8, 1995. On February 15, 1999, the Arkansas Department of Environmental Quality (ADEQ) revised and recodified Regulation 19.

The purpose behind Regulation 26.1002(A) is to prohibit significant New Source Review (NSR) changes from being processed under the title V minor permit modification procedures. Some of the emission increases proposed under Regulation 26.1002(A) are title I modifications, CAA sections 101-193, 42 U.S.C. 7401-7515, and thus cannot be processed as title V minor permit modifications.

Title I modifications include any major modification under major NSR. For example, Regulation 26.1002(A) provides that an emissions increase of 0.6 tpy of lead or 15 tpy of PM10 could be processed as a minor permit modification. However, these emission increases would be considered major modifications under PSD. Thus, these changes are considered title I modifications, and cannot be processed as a minor permit modification under Regulation 26.1002 and remain consistent with 40 CFR part 70. However, it is our understanding that Arkansas intends that the other gatekeeper provisions of Regulation 26.1002 would prevent such increases from being processed as a minor permit modification to part 70 operating permits. In fact, Regulation 26.1002(G) prevents minor permit modification procedures from being used for any changes that are “modifications under any provision of title I of the Act,” consistent with part 70.

Section 19.904(a) incorporates 40 CFR 52.21(b)-(r), except section 52.21(i)(12). 40 CFR 52.21(b)(2)(i) and 52.21(b)(23)(i) define the net emission increases that are considered major modifications for PSD.

With this understanding that the gatekeeper provisions would prevent all title I modifications—or any other gatekeeper category prohibition under Regulation 26.1002—from being processed as minor permit modifications, we no longer have any objection to this provision.

In addition, Arkansas revised the definition of “modification” in Regulation 19, Chapter 2. This removed the final impediment to approval of this provision. See 60 FR at 46772.

The third and final condition for full approval of Arkansas' operating permit program was that Arkansas “must ensure consistency between the operating permits program (Regulation 26) and the State Implementation Plan (SIP) (Regulation 19).” 60 FR 46773. Regulation 19 was submitted to EPA as a revision to the SIP on March 5, 1999. We approved Regulation 19 into the SIP on October 16, 2000. See 65 FR 61103. With regard to title V, this is no longer an interim approval issue. We believe that the Regulation 19 submittal satisfies the title V deficiency identified as Item 3 in the September 8, 1995, Federal Register notice.

Arkansas adopted the changes as discussed above on July 21, 2000. The rules became effective on August 10, 2000. Arkansas submitted these revisions to EPA on August 4, 2000.

The State is also adjusting its title V fee accounting procedures to include a two-step process to separate monies that represent amounts attributed to activities that incorporate Federal requirements from those that represent State-only requirements. The comprehensive fee of $19.12 per ton is assessed for all title V sources, based on allowable emissions, less HAPs. That amount attributed to activities that incorporate Federal requirements into the permits will be $15.296 per ton and the rest of the fee will be attributed to activities incorporating State-only conditions. Arkansas requires $5,191,370 to cover the cost of the title V program as delineated in the fee demonstration. The State plans to collect a total of approximately $7,189,943 per year in fees from title V sources. $5,310,000 will represent the amount collected for activities that incorporate Federal requirements and $1,879,943 will represent the amount collected for those activities associated with State-only requirements. The current proposal will result in $5,310,000 in title V fee revenue, which will be sufficient to cover the program costs with an adequate margin of safety. The amount collected to incorporate Federal requirements into the title V permit are considered as meeting the requirement that the State must collect enough fees to sustain the title V program. The ADEQ has the authority to adjust the fee as necessary using its rulemaking authority. The demonstration submitted by Arkansas meets the requirements of 40 CFR 70.4(b)(7) and (8).

D. What Is Involved in This Final Action?

The State of Arkansas has fulfilled the conditions of the interim approval granted on September 8, 1995 (60 FR 46771), so EPA is taking final action to fully approve the State's Operating Permit Program. EPA is also taking action to approve other nonsubstantive program changes made by the State since the interim approval was granted. Other changes include recodifying the entire Regulation 26 and making such editorial changes as deleting the words “Department of” and adding the word “Commission” to the name of the agency “Arkansas Pollution Control & Ecology Commission.”

II. State Implementation Plan (SIP)

A. What Is a SIP?

Section 110 of the Clean Air Act (CAA) requires States to develop air pollution regulations and control strategies to ensure that State air quality meets the national ambient air quality standards established by EPA. These ambient standards are established under section 109 of the CAA, and they currently address six criteria pollutants. These pollutants are: carbon monoxide, nitrogen dioxide, ozone, lead, particulate matter, and sulfur dioxide. Each State must submit these regulations and control strategies to EPA for approval and incorporation into a Federally enforceable SIP. Each Federally approved SIP protects air quality primarily by addressing air pollution at its point of origin. These SIPs can be extensive, containing State regulations or other enforceable provisions and supporting information such as emission inventories, monitoring networks, and modeling demonstrations.

B. What Is the Federal Approval Process for a SIP?

In order for State regulations to be incorporated into the Federally enforceable SIP, States must formally adopt the regulations and control strategies consistent with State and Federal requirements. This process generally includes a public notice, public hearing, public comment period, and a formal adoption by a State-authorized rulemaking body. Once a State rule, regulation, or control strategy is adopted, the State submits it to us for inclusion into the SIP. We must provide public notice and seek additional public comment regarding the proposed Federal action on the State submission. If adverse comments are received, they must be addressed prior to any final Federal action by us. All State regulations and supporting information approved by EPA under section 110 of the CAA are incorporated into the Federally approved SIP. Records of such SIP actions are maintained in the Code of Federal Regulations (CFR) at title 40, part 52, entitled “Approval and Promulgation of Implementation Plans.” The actual State regulations which are approved are not reproduced in their entirety in the CFR outright but are “incorporated by reference,” which means that we have approved a given State regulation with a specific effective date.

C. What Does Federal Approval of a State Regulation Mean To Me?

Enforcement of the State regulation before and after it is incorporated into the Federally approved SIP is primarily a State responsibility. However, after the regulation is Federally approved, we are authorized to take enforcement action against violators. Citizens are also offered legal recourse to address violations as described in section 304 of the CAA.

D. What Is Being Addressed in This Action?

We are approving Regulation 26 as it pertains to the Arkansas SIP. When Arkansas revised Regulation 26 to address the interim approval issues, it made some minor changes, such as recodifing the entire rule. When we approved the Arkansas SIP last October this revised rule was not finalized, so we approved the original Regulation 26. We are now approving the recodified rule as submitted on August 4, 2000. However, there are no significant changes, and the rule remains substantially the same as was approved in our October 16, 2000 action. See 65 FR 61103.

E. Why Is EPA Approving the NSR Provisions of Regulation 26 Into the Arkansas SIP?

Chapter 11 of Regulation 19 (approved October 16, 2000, FR 61103) addresses the NSR permitting procedures for major sources which are also subject to Regulation 26—Regulations of the Arkansas Operating Permit Program. Regulation 26 is Arkansas' regulation for its Operating Permit Program under title V of the CAA. Chapter 9 of Regulation 19 describes the process already approved by EPA, for issuance of a permit to a new major source or a major modification of a permit to of an existing source which is major for purposes of the PSD program, by virtue of incorporation by reference of the provisions of 40 CFR 52.21(b)-(r). Chapter 11 requires major sources which are subject to Regulation 26 to also have their permit applications processed in accordance with the procedures contained in Regulation 26, which are incorporated by reference. Thus, Chapter 11 creates the connection between the PSD and title V programs to allow Arkansas to issue one permit to its sources which are defined as major under both programs.

For minor sources, the permitting process is described in Chapter 4 of Regulation 19, which complies with 40 CFR 51.160-51.164. Chapters 4 and 9 of Regulation 19 do not, however, fully address all sources defined as major sources under section 302(j) of the CAA. Chapter 11 is necessary to provide a process for permitting the following:

  • Sources which are major for purposes of PSD but undergo a physical change or change in the method of operation which does not result in a significant net emission increase, i.e., minor modifications. Such a change therefore is not subject to PSD review. Subpart I, however, applies to the construction and modification of all sources, including major and minor sources. Such a change, therefore, must meet the applicable requirements of 40 CFR 51.160-51.164. Regulation 26 contains the provisions which satisfy these provisions of subpart I. These provisions are incorporated into Regulation 19 by Chapter 11.
  • A source which is major for title V but not major for PSD. This would include a source whose potential to emit is 100 tpy or more but less than 250 tpy and is not one of the source types listed in 40 CFR 52.21(b)(1). Although a new or modified source which is not a PSD major source is not subject to PSD, the applicable requirements of 40 CFR 51.160-51.164 nonetheless continue to apply as explained above. Regulation 26 contains the provisions which satisfy these provisions of subpart I. These provisions are incorporated into Regulation 19 by Chapter 11.

Chapter 11 of Regulation 19, incorporates the applicable requirements of 40 CFR part 51, subpart I (subpart I) that are in Regulation 26 into Regulation 19, which we have approved into the SIP. Through Chapter 11, the subpart I provisions of Regulation 26 are incorporated by reference.

40 CFR part 51, subpart I contains the requirements that a SIP-approved program for review of new and modified sources must meet. The subpart consists of §§ 51.160-51-166.

Through Chapter 11 of Regulation 19, Arkansas ensures that the construction and modification of sources subject to the preconstruction review requirements of the Act will meet the applicable requirements of subpart I. Our October 16, 2000, action includes our analysis of the provisions of Regulation 26 which Arkansas incorporated by reference into Regulation 19 and describes how Regulation 26 meets the requirements of subpart I. It further demonstrates that the procedures in Regulation 26 will ensure that modifications which occur at title V sources will satisfy the requirements of the Act and subpart I.

On October 16, 2000 we approved portions of Regulation 26 which Arkansas adopted July 23, 1993, and submitted to us on October 29, 1993, into the SIP. We had previously approved this version of Regulation 26 at 60 FR 46171 (September 8, 1995) as satisfying the requirements for interim approval under 40 CFR part 70. We have reexamined Arkansas' revisions to Regulation 26 which it submitted to us on August 4, 2000. We find that the revised Regulation 26 continues to meet the requirements of subpart I.

F. Have the Requirements for Approval of a SIP Revision Been Met?

The State submittal has met the public notice requirements for SIP submissions in accordance with 40 CFR 51.102. The submittal also satisfied the completeness criteria of 40 CFR part 51, appendix V. In addition, as explained above and in more detail in the technical support document which accompanies this document, the revision meets the substantive SIP requirements of the CAA, including section 110 and implementing regulations.

G. What Action Is EPA Taking?

We are processing this action as a direct final action because the revisions make routine changes to the existing rules which are noncontroversial. Therefore, we do not anticipate receiving any adverse comments.

III. Conclusion

We are taking final action to fully approve the Operating Permit Program of the State of Arkansas and to also approve Arkansas Regulation 26 as it pertains to the State Implementation Plan (SIP). EPA is publishing this action without prior proposal because the Agency views this as a noncontroversial amendment and anticipates receiving no adverse comments. However, in the proposed rules section of this Federal Register publication, EPA is publishing a separate document that will serve as the proposal to grant final full approval should adverse comments be filed. This action will be effective December 10, 2001 unless the Agency receives adverse comments by November 8, 2001.

If EPA receives such adverse comments, then EPA will withdraw the final rule and inform the public that the rule will not take effect. All public comments received will then be addressed in a subsequent final rule based on the proposed rule. EPA will not institute a second comment period. Parties interested in commenting should do so at this time. If no such comments are received, the public is advised that this rule will be effective on December 10, 2001 and no further action will be taken on the proposed rule.

IV. Administrative Requirements

Under Executive Order 12866 (58 FR 51735, October 4, 1993), this action is not a “significant regulatory action” and therefore is not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001). This action merely approves state law as meeting federal requirements and imposes no additional requirements beyond those imposed by state law. Accordingly, the Administrator certifies that this rule will not have a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because this rule approves pre-existing requirements under state law and does not impose any additional enforceable duty beyond that required by state law, it does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Public Law 104-4).

This rule also does not have tribal implications because it will not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). This action also does not have Federalism implications because it does not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This action merely approves a state rule implementing a federal standard, and does not alter the relationship or the distribution of power and responsibilities established in the Clean Air Act. This rule also is not subject to Executive Order 13045 “Protection of Children from Environmental Health Risks and Safety Risks” (62 FR 19885, April 23, 1997), because it is not economically significant.

In reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. In this context, in the absence of a prior existing requirement for the State to use voluntary consensus standards (VCS), EPA has no authority to disapprove a SIP submission for failure to use VCS. It would thus be inconsistent with applicable law for EPA, when it reviews a SIP submission, to use VCS in place of a SIP submission that otherwise satisfies the provisions of the Clean Air Act. Thus, the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply.

This rule does not impose an information collection burden under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.)

The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by December 10, 2001. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this rule for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

List of Subjects

40 CFR Part 52

  • Environmental protection
  • Air pollution control
  • Intergovernmental relations
  • New source review
  • Reporting and recordkeeping requirements

40 CFR Part 70

  • Environmental protection
  • Administrative practice and procedure
  • Air pollution control
  • Intergovernmental relations
  • Operating permits
  • Reporting and recordkeeping requirements

Dated: September 20, 2001.

Gregg A. Cooke,

Regional Administrator, Region 6.

Parts 52, chapter I, title 40 of the CFR is amended as follows:

PART 52—[AMENDED]

1. The authority citation for part 52 continues to read as follows:

Authority: 42 U.S.C. 7401 et seq.

Subpart E—Arkansas

2. In § 52.170(c), the table is amended as follows:

(a) Under the heading “Regulation 26: Regulations for the Arkansas Operating Permit Program,” remove the existing entries for Section 3, Section 4, Section 5, and Section 6, and add new entries for Chapter 3, Chapter 4, Chapter 5, and Chapter 6 as shown below;

(b) Remove the heading “Prevention of Significant Deterioration Supplement to the Arkansas Plan of Implementation for Air Pollution Control'; and remove the entries for Section 1, Section 2, Section 3, Section 4, Section 5, and Section 6 under the heading “Prevention of Significant Deterioration Supplement to the Arkansas Plan of Implementation for Air Pollution Control';

(c) Remove the heading “Regulation for the Control of Volatile Organic Compounds” and remove the entries for Section 1, Section 2, Section 3, Section 4, Section 5, and Section 6 under the heading “Regulation for the Control of Volatile Organic Compounds.”

§ 52.170
Identification of plan.

(c) * * *

EPA Approved Regulations in the Arkansas SIP

State citation Title/subject State submittal/effective date EPA approval date Comments
*         *         *         *         *         *         *
Regulation 26: Regulations of the Arkansas Operating Permit Program
Chapter 3: Requirements for Permit Applicability
Section 26.301 Requirement for a permit 08/10/00 10/9/01 [and page number]
Section 26.302 Sources subject to permitting 08/10/00 10/9/01 [and page number]
Chapter 4: Applications for Permits
Section 26.401 Duty to apply 08/10/00 10/9/01 [and page number]
Section 26.402 Standard application form and required information 08/10/00 10/9/01 [and page number]
Section 26.407 Complete application 08/10/00 10/9/01 [and page number]
Section 26.409 Confidential information 08/10/00 10/9/01 [and page number]
Section 26.410 Certification by responsible official 08/10/00 10/9/01 [and page number]
Chapter 5: Action on Application
Section 26.501 Action of part 70 permit applications 08/10/00 10/9/01 Subsection B Not in SIP
Section 26.502 Final action on permit application 08/10/00 10/9/01 [and page number]
Chapter 6: Permit Review by the Public, Affected States, and EPA
Section 26.601 Untitled introduction to Chapter 6 08/10/00 10/9/01 [and page number]
Section 26.602 Public participation 08/10/00 10/9/01 Only Subsection A(1), A(2), A(5), and D in SIP
Section 26.603 Transmission of information to the Administrator 08/10/00 10/9/01 [and page number]
Section 26.604 Review of draft permit by affected States 08/10/00 10/9/01 [and page number]

For reasons set out in the preamble, Appendix A of part 70 of title 40, chapter I, of the Code of Federal Regulations is amended as follows:

PART 70—[AMENDED]

1. The authority citation for Part 70 continues to read as follows:

Authority: 42 U.S.C. 7401 et seq.

2. Appendix A to Part 70 is amended by revising paragraph (b) in the entry for Arkansas to read as follows:

Appendix A to Part 70—Approval Status of State and Local Operating Permits Programs

Arkansas

(b) The Arkansas Department of Environmental Quality submitted program revisions on August 4, 2000. The rule revisions adequately addressed the conditions of the interim approval effective on October 10, 1995, and which would expire on December 1, 2001. The State is hereby granted final full approval effective on December 10, 2001.

[FR Doc. 01-24902 Filed 10-5-01; 8:45 am]

BILLING CODE 6560-50-P