The director shall consider the time required for each remedy to attain standards for air, soil and water specified in paragraph (a)(ii) or subsection (c) or (d) of this section, as applicable.
A remedy involving monitored natural attenuation may be considered whether or not the director has made a determination of technical impracticability under subsection (d) of this section. Monitored natural attenuation shall be deemed effective if there is evidence that natural attenuation is occurring and will be completed within a reasonable time period;
Notwithstanding the provisions of paragraph (a)(i) of this section, or W.S. 35-11-1609 such controls may be imposed by the owner without the site receiving a use control area designation under W.S. 35-11-1609. The standards of paragraph (a)(ii) of this section must be met if the owner or operator applies to remove the use restrictions applicable to the site or to receive a no further action letter under W.S. 35-11-1608.
W.S. 35-11-1605